My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-2406
Zephyrhills
>
Building Department
>
Permits
>
2003
>
03-2406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:06:53 PM
Creation date
1/9/2007 2:45:34 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
03-2406
Building Department - Name
ALSTON,JEFFERY
Address
5342 SATSUMA DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SCHAPER ROOFING, INC. <br /> <br />8949 Gall Blvd. Zephyrhills, FL 33541 <br />PH: (352) 567-8580 & (813) 782-0920 Fax: (813) 715-4762 <br />STATE CERTIFIED BUILDING AND ROOFING CONTRACTOR *,CB-C059817 and *,CC-C058134 <br />Serving Florida's Finest Homes & Businesses since 1976 <br /> <br />Name Jeff Alston <br /> <br />Date _9/24/03 <br /> <br />Address 5340-5342 Satsuma Dr. <br /> <br />Phone 352-567-6361 F352-567-7327 <br /> <br />Zephvrhills. FL 33526 <br /> <br />City/County _City <br /> <br />Parcel # <br /> <br />We hereby propose to furnish materials and labor necessary for the completion of: <br /> <br />Shingle Reroof <br /> <br />1. For the shingled portions of the home, remove old roofing materials to dry-in, taking precautions to protect the <br />building and the landscaping. Groom the deck and reset existing decking nails. <br />2. Replace bad wood other than herein agreed for at _$36.00 _ per man-hour plus materials marked up a 25% <br />contractor's fee. <br /> <br />3. Install _Brown <br /> <br />eaves drip with all edges sealed with plastic cement. <br /> <br />4. Install one layer(s) of ASTM IS lb. Asphalt shingle underlayment. <br />5. Install galvanized valley metal for the length of all valleys. Valleys will be closed. <br />6. Install new lead boots over vent pipes and replace metal vents with new. <br />7. Chalk lines shall be struck to assure proper shingle exposure. <br /> <br />8. Install_30_ year _XT30AR <br /> <br />Manufacturer: Certainteed <br /> <br />Color: Choice <br /> <br />Class a self-sealing fungus resistant fiberglass shingles. <br />'~ / a' ." <br />j "I...-,..,.,~"\. ..; j .../~C"'/ <br />, , <br /> <br />9. Six I W' corrosion resistant nails shall be installed per manufacturers instructions. <br />Options <br />Hurricane nails the deck to the rafters to meet current SBCCI code. * <br /> <br />Install _ 40_ feet of yainted <br /> <br />aluminum ridge vent. * <br /> <br />*See Pricing Section <br /> <br />Server G! My Documents! Sales Team and Production Contracts! Shingle Reroof <br />
The URL can be used to link to this page
Your browser does not support the video tag.