Laserfiche WebLink
<br />Ryman Construction <br />lot #18 laurelwood <br /> <br /> SQ. FEET PRICE <br />MAIN OR LIVING: 1,413 $ 50.00 <br />OTHER AREA UNDER ROOF: 675 $ 25.00 <br />OTHER: - $ - <br />VALUATION $ 87,525.00 <br />FEE SHEET $ 432.00 <br />ADDRESS $ 30.00 <br />DRIVEWAY $ 30.00 <br /> <br />BUILDING: $ 708.00 <br />CREDIT: $ - <br />BUILDING LESS CREDIT: $ 708.00 <br />ELECTRICAL: $ 109.35 <br />PLUMBING: $ 92.50 <br />MECHANICAL: $ 70.30 <br />RADON: $ 20.88 <br />TOTAL $ 1,001.03 <br /> <br />SEWER: $ 1,616.00 <br />WATER: $ 419.00 <br />IRRIGATION: $ - <br />TOTAL: $ 2,035.00 <br /> <br />WATER METER:I $ <br />IRRIGATION METER $ <br /> <br />180~00 I <br /> <br />SUB-TOTAL $ <br /> <br />3,216.03 I <br /> <br />SIF'S: $ 1,694.00 <br />97.5% $ 1,651.65 <br />2.5% $ 42.35 <br /> <br />TI F'S: $ 1,480.00 <br />99% $ 1,465.20 <br />1% $ 14.80 <br /> <br />TOTAL: $ <br /> <br />6,390.03 I <br />