Laserfiche WebLink
<br />dllu <br /> <br />DAVID L. WALLACE & ASSOC. P.A. No.5441 <br />david I. wallace & associates p.o. <br />architects <br /> <br />p. 1 <br /> <br />Oct.14. 2004 10:12AM <br /> <br />October 14,2004 <br /> <br />Mr. Bill Burgess <br />City of Zeph)Thi1ls <br />Building Department <br />5335 Eighth Street <br />Zephyrhills, FL 33540 <br /> <br />VIA Fax: (813) 780-0021 <br /> <br />RE: Microtel hm & Suites <br />Zephyrhills, FL <br /> <br />Dear Mr. Burgess: <br /> <br />The general contractor has requested a modification of the size of the porch post. The <br />substitution of a 3" steel pipe post as shown on the contract documents to a 8" metal fluted <br />column is acceptable. The column modification must support an axial load of 4,000 pounds at a <br />unsupported height of9'-0". Any further modifications or changes must be verified by the <br />engineer at this office, <br /> <br />Please call if! may offer further assistance. <br /> <br />Very truly yours, <br /> <br />David L. Wallace and Associates, P.A. <br /> <br />JT~~~ <br /> <br />Dennis West, P .E. <br />PE 61164 <br /> <br />Cc: E. B. Jackson <br /> <br />542 douglas avenue <br />dunedin, florida 34698 <br /> <br />727/736.6000 <br />FAX 738.8343 <br />