My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-2576
Zephyrhills
>
Building Department
>
Permits
>
2003
>
03-2576
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:05:59 PM
Creation date
1/11/2007 11:22:18 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
03-2576
Building Department - Name
COMMUNTIY NATIONAL
Address
6930 GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br />.-' - '. <br />-I- - <br />~~~ <br /> <br />To: <br /> <br />1< 'I_ale 1<(J(J.ltIe9 <br /> <br />A Division of Ryman Construction, Inc. <br /> <br />{k'?r7/??, /f,//!- T '-:d /fj\1fC <br />Ii; 7' 30 (h,-/ / 13 / V?L <br />7- h,lls" Ii. -~3f'-l-O <br /> <br />78'3 ~8'/?-?- <br />73'3 - 3S--Z"l Cj r:/f-~ <br /> <br />Date: <br /> <br />1. Complete tear off of exist~ shingles <br />2. Roof dried in with # / S felt <br />3. Install new valley metal with galvanized metal <br />4. Re-secure all loose roof decking <br />5. Install all new lead boots through the roof <br />6. Install all new drip edge around the perimeter of roof ) <br />7. Install all new "00 year fungus-resistant shingle ~~mj"'" SN.J,;t/# i ('FL;" <br />8. All debris removed from the job site <br />9. All material and labor furnished <br />/0,) $d~.u s (3 ') ~)( t../ ()14'=- 4~~ <' I~ ,v-r~ <br />II) f"u/w. &.5 ? t.I JI.e;L S (" 7Jd"W(.I -!i:6JoA I"s / A.J <br />,6/fZ.. J{ A/. N. Cb..:. v~ ~/?:...u ,I ~{ 0'-"5 <br /> <br />S'".:9 .6lej,,,I,1-tJt:L <br /> <br />Total bid price $ <br />Extra's - tJO <br /> <br />Bad plywood replaced at"! cost of $ 3 S, per slteet in tlte roof field. All otlter wood work suclt as valley rebuilding or rafter replacement will <br /> <br />be a cltarge of $ 40 1)1:.. per man per Itour plus tlte cost of materials <br /> <br />7-/ <br />, <br /> <br />3~~ t:iJ <br /> <br />All material is guaranteed to be as specified, and the above work to be done in accordance with the drawings and specifications submitted for above work <br />and completed in a substantial workmanlike manner for the sum of <br /> <br />With payment as follows: {".~ ~ho,.v <br /> <br />Dollars ($ 2~ 385:: ~ ) <br /> <br />Any alteration or deviation from above specifications involving extra costs, will be executed only upon written order. and will become an extra charge over and above the estimate, All agreements <br />contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado, and oth\:r necessary insurance upon above work, Workmen's compensation and public liability <br />insurance on above work to be taken out by Ryman Construction, Inc. <br /> <br />Respectfully submitted <br /> <br />Po, 1,(... ~ +- <br /> <br />Acceptance of pro;o~VY"'" <br />The above prices, specifications and conditions are satisfactory and are her Yo are authorized to do the work as specified, <br /> <br />Date: / 2 III h, 5 Signature:" <br /> <br /> <br />Ryman Construction, rnc, Will not be responsible for <br />any septic tank, sod, or shrubbery damage. <br />Payment due upon receipt of Invoice <br /> <br />Please note: A charge of 1.5% will be made on all unpaid balances after 30 days, which is an annual percentage rate of 18% applied to past due balances <br /> <br />For your convenience we accept <br /> <br />_a!:l~_ <br /> <br />37325 S. R. 54 W. . Zephyrhills, Florida 33542 <br />(813) 782-6094 . License # CCC-1325505 <br />
The URL can be used to link to this page
Your browser does not support the video tag.