Laserfiche WebLink
<br />..... <br /> <br />,/''':' <br /> <br />~~~ <br /> <br />~'IHeale ~ (J.(J./tIe9 <br />A Division of Ryman Construction, Inc. <br /> <br />To: <br /> <br />1t1ts'. tJIII~~7~5 <br />56,3'7 j'lH 5~i:, <br />2-AI/ls. Ii- 33)d-S~ <br />/ <br /> <br />?~2 -Z/(P~ <br /> <br />Date: <br /> <br />1-13 -tJ4 <br /> <br />1. Complete tear off of eXJs~ shingles <br />2. Roof dried in with # felt <br />3. Install new valley metal with galvanized metal <br />4. Re-secure all loose roof decking <br />5. Install all new lead boots through the roof <br />6. Install all new drip e~e around the perimeter of roof _ .f:, 04/*) 5#--/v' 1.1~,t:../ ~-r <br />7. Install all new ~) year fungus-resistant shingle 3 ..- / A l~ , <br />8. All debris removed from the job site t;J}.H-rC &t/e:'/)~ <br />9. All material and labor furnished <br /> <br />li)J?du~5(3)Skls/'7~ <br /> <br />I~ ~~ ~. <br />li0 LIt}A-h~~" ;tc/s -/-"(.) be- /U./~7dld <br /> <br />Total bid price $ <br />Extra's /"1J. ID <br />Bad plywood rePla:Jt at i:?ost of $ ~ per slreet in tire roof field. All otlrer wood work suclr as valley rebuilding or rafter replacement will <br />be a clrarge of $ '0. per man per Irour plus tire cost of materials <br /> <br />338()( crJ <br /> <br />All material is guaranteed to be as specified, and the above work to be done in accordance with the drawings and specifications submitted for above work <br />and completed in a substantial workmanlike manner for the sum of <br /> <br />With payment as follows: <br /> <br />~~ <br /> <br />~~0P0 <br /> <br />Dollars ($ ;3 380, triJ <br /> <br />Any alteration or deviation from above specifications involving extra costs. will be executed only upon written order, and will become an extra charge over and above the estimate, All agreements <br />contingent upon strikes. accidents or delays beyond our conlrol. Owner to carry tire, tornado, and other necessary insurance upon above work, Workmen's compensation and public liability <br />insurance on above work to be laken out by Ryman Construction, Inc. <br /> <br />Acceptance of Pro po I <br />The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. <br /> <br />Signature: 'A ~ ~ r I~ <br /> <br /> <br />~ <br /> <br />Per <br /> <br />Date: <br /> <br />Ryman Construction, Inc. Will not be responsible for <br />any septic tank, sod, or shrubbery damage. <br />Payment due upon receipt of Invoice <br /> <br />Please note: A charge of 1.5% will be made on all unpaid balances after 30 days, which is an annual percentage rate of 18% applied to past due balances <br /> <br />For your convenience we accept <br /> <br />_=rciil_ <br /> <br />37325 S, R. 54 W. . Zephyrhills, Florida 33542 <br />(813) 782-6094 . License # CCC-1325505 <br />