My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-2696
Zephyrhills
>
Building Department
>
Permits
>
2004
>
04-2696
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:26:12 PM
Creation date
1/16/2007 10:36:35 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
04-2696
Building Department - Name
HATFIELD,FREDERICK
Address
5616 23RD ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />"J,',."."".,'( <br />r <br /> <br /> <br />BRIGHT HOUSE NETWORKS <br />GENERAL RlGHT OF WAY PERMIT <br /> <br />EXHIBIT" A " <br /> <br />Bright house Networks daily activities that do not require a specific right of way utilization pennit <br />when working within the boundaries of Pasco County right of way <br /> <br />New Customer Service <br /> <br />1. Installation of service drops from serving location. <br />2. Installation of new aerial distribution cable from existing poles. <br />3. Installation of a second aerial distribution cable from existing poles, <br />4, Extension of existing aerial distribution cable from existing poles, <br />5, Installation of anew bw-ied distribution cable that does not oross or begin in the pavcement. <br />6, Extension of an existing buried distribution cable that does not cross or begin in the pavement. <br />7, Installation of two way four inch conduit system that does not cross or begin in the pavement. <br />8, Extension of a two way four inch conduit systam that does not cross or begin in the pavement. <br />9. Installation of a new pole line. <br />10. Extension of existing pole line providing it does not encroach into an underground utility area, <br />11, Adding of new equiptment to existing cable. <br />12, Pulling in new underground feeder cables in an existing pennitted manhole and conduit system. <br />13, Digging of a splice hole to splice a new cable or changing equiptment. <br />14, Digging of a splice hole for cable acceptance testing for quality, <br />15, Digging of a splice hole to change the size of a cable leg for new service, <br /> <br />Mqintenance of ];:xistine CATV Facilities <br /> <br />1. Replacement of existing service drops. <br />2, Replacement! repair of an existing aerial cable providing other aerial utility service still exist. <br />3. Replacement of existing poles providing other aerial utility service still exist. <br />4, Replacement! repair of existing equiptment. <br />5, Replacement! repair of an existing underground feeder cable in an existing pennitted manhole <br />and conduit sy:;tem, <br />6. Pumping water out of a manhole to maintain undergroWld cables in conduit system. <br />7, Digging of splice holes to locate and repair damaged cables. <br />8, Digging of a splice hole to change the size of the cable. <br />9, Digging of a splice hole to add a side leg off feeder cable, <br />10, Digging of Ii hole to repair broken conduits, <br />11. Digging of a splice hole for cable acceptance testing for quality, <br />12. Digging of a splice hole to repair damaged cable. <br />13. !Digging of a hole to verify the location of buried facilities. <br />14. Removal of facilities no longer needed for service, <br />15, Tree trimming to clear aerial facilities, <br />16. Adjust aerial facilities to accommodate other users of pole line and! or to meet National Electri <br />Safety Code, <br />
The URL can be used to link to this page
Your browser does not support the video tag.