<br />I <br /> <br />.! <br /> <br /> <br /> <br />EXIllBIT .. B .. continued <br /> <br />2) The Bright house Networks Engineer will notifY the Pasco COWlty Inspector of the situation <br />and schedule a field meeting, (Every effort will be made to arrange the field meeting within <br />a time frame that will not require the Construction Crew to leave the site and reshedule the <br />work.) <br /> <br />3) Th.e Bright house Networks Engineer will be responsible tor notification all appropriate <br />personnel of the time and location of the field meeting, <br /> <br />4) A mutual understanding of the scope of work required to 'iomplete the project will be achieved <br />at the field meeting, <br /> <br />5) At the Pasco C01111ty Inspector's discretion, a verbal approval of the work may be issued <br />allowing work to resume, <br /> <br />6) The Bright house Networks Engineer shall apply for a $ite spt:cific Permit inclusive of all <br />details as agreed upon at the field meeting. (If a Verbal.A\;pproval was granted, the site specific <br />shall be submitted as an" After -the-Fact" application,) <br /> <br />1) Upon completion of the work, the Pasco COWlty Inspector shall be notified for a final <br />inspection of the project. <br /> <br />--'RIGHT OF WAY RESTORATION <br /> <br />· All disturbed areas in the right of way will be sodded unless otherwise directed by Pasco <br />COlUlty Inspector, Sod must be maintained Wltil it roots, a minimwn water 01'2 weeks, <br /> <br />· Vegetation, other than sod, will be restored to its pre-construcion condition. <br /> <br />· Prior to disturbing sprinkler systems, plants and mailboxes that may be disturbed during <br />construction, notify property owners, Replace those items that are damaged by pennittee, <br /> <br />· The permittee shall be responsible for handling all complaints regarding the construction <br />project. <br />