Laserfiche WebLink
<br />( <br /> <br />";"J <br /> <br /> <br />BRIGHT HOUSE NETWORKS <br />GENERAL RIGIIT OF WAY PERMIT <br /> <br />EXlDBIT " B " <br /> <br />A GENERAL RIGH OF WAY PERMIT (GRP) - is given for certain routine repetitive work not requiring <br />a specific permit defined on Exhibit" A " that is 5 feet or greater from back of curb (BOC) or edge of <br />pavement (EP). <br /> <br />No roadway will be open cut or directional drilled with this permit. <br /> <br />Upon completion of work the Pasco COW'lty Inspector shall be notified for a final inspection of the <br />project. <br /> <br />Best Management Pracuces (BMP) will be observed at all times, <br /> <br />Notify SW1Shine State One Call of Florida at 1-800-432-4770 not less than 48 hours or more than <br />5 days prior to construction,and all other requirements of Florida Statute 556 will be observed at <br />all times. <br /> <br />MAINTENANCE OF TRAFFIC <br /> <br />· All activities in accordance with this agreement will require confonnance to the "Manual of <br />Traffic Control and Safe Practices for Street and Highway Construcion, Maintenance and <br />Utility Operations." (Chapter 316, Florida Statues) <br /> <br />· Pedestrian, bicycle and handicap traffic must be safely maintained and must not be redirected <br />into the roadway or into ditches. Use of sidewalks may not be impaired or closed for greater <br />that 60 minutes. When a sidewalk is to be removed means of rerouting pedestrians, bicyclists <br />and handicapped people must be constructed prior to sidewalk removal pe~ Florida <br />Department of Transportation (FDOT), Manual on Uniform Traffic Control Revises MUTCD <br />and American Disabilities Act (ADA), <br /> <br />· No street shall be closed without the prior written permission of Pasco COW'lty Inspector, At <br />least 2 normal working days (Monday thru Friday) advance notice is required, All <br />maintenance of traffic plans are to be submitted to the Pasco County Inspector for approval <br />prior to commencement of construction, Appropriate worlc zone safety is to be followed at all <br />times. <br /> <br />· All construction activities shall include traffic control through the work zone in accordance <br />with FDOT " Roadway and Traffic Design Standards" Indexes 600 Series titled" Traffic <br />Control Through Work Zones," <br /> <br />Where it is discovered that a site specific pennit will be required, i.e" during excavation existing facilities <br />become less that 5 feet from BOClEP, <br /> <br />1) . The Construction Supervisor will notify the Bright house Networks Engineer that a project <br />Carmot be completed under the GRP, <br />