Laserfiche WebLink
<br />Ryman Construction <br />Lot #10 Highland Loop <br /> <br /> SQ,FEET PRICE <br />MAIN OR LIVING: 1,737 $ 50.00 <br />OTHER AREA UNDER ROOF: - $ 25.00 <br />OTHER: - $ - <br />VALUATION $ 86,850.00 <br />FEE SHEET $ 428.00 <br />ADDRESS $ 30.00 <br />DRIVEWAY $ 30.00 <br /> <br />BUILDING: $ 702.00 <br />CREDIT: $ - <br />BUILDING LESS CREDIT: $ 702.00 <br />ELECTRICAL: $ 107.60 <br />PLUMBING: $ 92.50 <br />MECHANICAL: $ 67,97 <br />RADON: $ 17.37 <br />TOTAL $ 987.44 <br /> <br />SEWER: $ 1,616.00 <br />WATER: $ 419.00 <br />IRRIGATION: $ - <br />TOTAL: $ 2,035.00 <br /> <br />WATER METER:I $ <br />IRRIGATION METER $ <br /> <br />180~00 I <br /> <br />SUB-TOTAL $ <br /> <br />3,202.44 I <br /> <br />SIF'S: $ 1,694.00 <br />97.5% $ 1,651.65 <br />2.5% $ 42.35 <br /> <br />-J ff Co <br />1 ;tUJ <br /> <br />TI F'S: $ 1,588.00 <br />99% $ 1,572.12 <br />1% $ 15.88 <br /> <br />TOTAL: $ 6,484.44 f <br />