My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-2807
Zephyrhills
>
Building Department
>
Permits
>
2004
>
04-2807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:25:42 PM
Creation date
1/24/2007 10:41:59 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Plan/Print
Permit #
04-2807
Building Department - Name
CITY OF Z-HILLS
Address
39450 SOUTH AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />" <br /> <br />.' <br /> <br />EXHIBIT "A" <br /> <br />1. All activities shall be implemented as set forth in the plans, specifications and performance criteria as approved <br />by this permit. Any deviation from the permitted activity and the conditions for undertaking that activity shall <br />constitute a violation of this permit. <br /> <br />2. This permit or a copy thereof, complete with all conditions, attachments, exhibits, and modifications, shall be kept <br />at the work site of the permitted activity. The complete permit shall be available for review at the work site upon <br />request by District staff. The permittee shall require the contractor to review the complete permit prior to <br />commencement of the activity authorized by this permit. <br /> <br />3. Activities approved by this permit shall be conducted in a manner which does not cause violations of state water <br />quality standards. The permittee shall implement best management practices for erosion and a pollution control <br />to prevent violation of state water quality standards. Temporary erosion control shall be implemented prior to <br />and during construction, and permanent control measures shall be completed within 7 days of any construction <br />activity. Turbidity barriers shall be installed and maintained at all locations where the possibility of transferring <br />suspended solids into the receiving waterbody exists due to the permitted work. Turbidity barriers shall remain <br />in place at all locations until construction is completed and soils are stabilized and vegetation has been <br />established. Thereafter the permittee shall be responsible for the removal of the barriers. The permittee shall <br />correct any erosion or shoaling that causes adverse impacts to the water resources. <br /> <br />4. Water quality data for the water discharged from the permittee's property or into the surface waters of the state <br />shall be submitted to the District as required by the permit. Analyses shall be performed according to procedures <br />outlined in the current edition of Standard Methods for the Examination of Water and Wastewater by the <br />American Public Health Association or Methods for Chemical Analyses of Water and Wastes by the U.S. <br />Environmental Protection Agency. If water quality data are required, the permittee shall provide data as required <br />on volumes of water discharged, including total volume discharged during the dQ.Ys of sampling and total monthly <br />volume discharged from the property or into surface waters of the state. <br /> <br />5. District staff must be notified in advance of any proposed construction dewatering. If the dewatering activity is <br />likely to result in offsite discharge or sediment transport into wetlands or surface waters, a written dewatering plan <br />must either have been submitted and approved with the permit application or submitted to the District as a permit <br />prior to the dewatering event as a permit modification. A water use permit may be required prior to any use <br />exceeding the thresholds in Chapter 40D-2, FAC. <br /> <br />6. Stabilization measures shall be initiated for erosion and sediment control on disturbed areas as soon as <br />practicable in portions of the site where construction activities have temporarily or permanently ceased, but in <br />no case more than 7 days after the construction activity in that portion of the site has temporarily or permanently <br />ceased. <br /> <br />7. Off-site discharges during construction and development shall be made only through the facilities authorized by <br />this permit. Water discharged from the project shall be through structures having a mechanism suitable for <br />regulating upstream stages. Stages may be subject to operating schedules satisfactory to the District. <br /> <br />8. The permittee shall complete construction of all aspects of the surface water management system, including <br />wetland compensation (grading, mulching, planting), water quality treatment features, and discharge control <br />facilities prior to beneficial occupancy or use of the development being served by this system. <br /> <br />ERP General Conditions <br />Individual (Construction, Conceptual, Mitigation Banks), General, Minor Systems <br />Page 1 of 3 <br /> <br />41.00-023 (Rev 03/02) <br />
The URL can be used to link to this page
Your browser does not support the video tag.