My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-2827
Zephyrhills
>
Building Department
>
Permits
>
2004
>
04-2827
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:25:35 PM
Creation date
1/24/2007 11:42:12 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Plan/Print
Permit #
04-2827
Building Department - Name
PANZER,JOHN
Address
38716 2ND AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT" B " c:onUnued <br /> <br />2) The Bright hoU6e Networks Engineer will noti.tY the Pasco County Inspector of the situation <br />and schedule a field meeting. (Every effort will be made to arrange the field meeting within <br />a time frame that will not require the Construction Crew to leave the site and reshedu1e the <br />work.) <br /> <br />3) The Bright house Networks Engineer will be responsible fur notification all appropriate <br />personnel of the time and location of the field meeting. <br /> <br />4) A mutual understanding of the scope of work required to complete the project will be achieved <br />at the field meeting. <br /> <br />5) At the Pasco Comty Inspector's discretion, a verbal approval of the work may be issued <br />allowing work to resume. <br /> <br />.. <br /> <br />6) The Bright houae Networks Engineer shall apply for a sUe specific Permit inclusive of all <br />details as agreed upon at the field meeting. (If a Verbal ~proval was granted, the &ite specific <br />shall be submitted as an" After -the-Fact" application.) <br /> <br />7) Upon completion of the work, the Pasco Comty Inspector shall be notified for a Ilnal <br />inspection of the project. <br /> <br />---lUGIIT OF WAY RESTORATION <br /> <br />· All disturbed areas in the right of way will be sodded wUess otheIWise directed by Pasco <br />County Inspector, Sod must be maintained until it roots, a minimum water of2 weeks. <br /> <br />· Vegetation, other than sod, will be restored to its pre-construcion condition. <br /> <br />· Prior to disturbing sprinkler systems, plants and mailboxes that may be disturbed during <br />construction, notifY property owners, Replace those items that are damaged by pennittee. <br /> <br />· The permittee shall be responsible for handling all complaints regarding the construction <br />project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.