Laserfiche WebLink
<br />EXHIBIT" B " c:onUnued <br /> <br />2) The Bright hoU6e Networks Engineer will noti.tY the Pasco County Inspector of the situation <br />and schedule a field meeting. (Every effort will be made to arrange the field meeting within <br />a time frame that will not require the Construction Crew to leave the site and reshedu1e the <br />work.) <br /> <br />3) The Bright house Networks Engineer will be responsible fur notification all appropriate <br />personnel of the time and location of the field meeting. <br /> <br />4) A mutual understanding of the scope of work required to complete the project will be achieved <br />at the field meeting. <br /> <br />5) At the Pasco Comty Inspector's discretion, a verbal approval of the work may be issued <br />allowing work to resume. <br /> <br />.. <br /> <br />6) The Bright houae Networks Engineer shall apply for a sUe specific Permit inclusive of all <br />details as agreed upon at the field meeting. (If a Verbal ~proval was granted, the &ite specific <br />shall be submitted as an" After -the-Fact" application.) <br /> <br />7) Upon completion of the work, the Pasco Comty Inspector shall be notified for a Ilnal <br />inspection of the project. <br /> <br />---lUGIIT OF WAY RESTORATION <br /> <br />· All disturbed areas in the right of way will be sodded wUess otheIWise directed by Pasco <br />County Inspector, Sod must be maintained until it roots, a minimum water of2 weeks. <br /> <br />· Vegetation, other than sod, will be restored to its pre-construcion condition. <br /> <br />· Prior to disturbing sprinkler systems, plants and mailboxes that may be disturbed during <br />construction, notifY property owners, Replace those items that are damaged by pennittee. <br /> <br />· The permittee shall be responsible for handling all complaints regarding the construction <br />project. <br />