Laserfiche WebLink
<br /> <br />MASTER <br />CONSULTING <br />ENGINEERS, INC. <br /> <br />2907 Bay to Bay Blvd., Suite 201 <br />Tampa, Florida 33629 <br />Phone 813-835-4885 <br />Fax 813-835-5226 <br />e-mail: MCE@mcengineers.com <br /> <br />THRESHOLD INSPECTION REPORT <br /> <br />Architect: <br />Project Name: <br />Location: <br />Contractor: <br /> <br />RBK Architects, Inc. <br />East Pasco Medical Center <br />Zephyrhills, Florida <br />Doster Construction, Inc. <br /> <br />Date: <br />Job No.: <br />Report No.: <br />Permit No: <br /> <br />December 6, 2004 <br />1214.167 <br />0.009 <br />2852 <br /> <br />Engineer: <br />Inspection By: <br /> <br />Master Consulting Engineers, Inc. <br />Robert L. Bell, E.1. <br /> <br />Items Inspected: <br /> <br />f] Inspection of mat foundation at gridline H/10. <br />IJ Inspection of foundation along gridline G/10, E.1/3 and E.1/1. <br />[J Inspection of concrete transfer beam along gridline E from 8 to 10. <br />fJ Inspection of mat foundation at gridline A from 9 to 11. <br /> <br />Reinforcing quantity and type is in accordance with the contract documents and is acceptable for placement <br />of concrete in the inspected areas. <br /> <br />Pending Issues: <br /> <br />None at this writing <br /> <br />Respectfully submitted, <br /> <br />11 i zd( <br /> <br />Robert L. Bell, E.1. <br /> <br />~ /zP/Y <br /> <br />Armando A Castellon, P.E. <br />Fl. Reg. # 43,453 <br />51 # 0931 <br /> <br />Cc: Zephyrhills Building Department <br />RBK Architects <br />Doster Construction, Inc [(1 )-Field Copy & (1) office copy] <br />File <br />