Laserfiche WebLink
<br /> <br />MASTER <br />CONSULTING <br />ENGINEERS, INC. <br /> <br />2907 Bay to Bay Blvd., Suite 201 <br />Tampa, Florida 33629 <br />Phone 813-835-4885 <br />Fax 813-835-5226 <br />e-mail: MCE@mcengineers.com <br /> <br />THRESHOLD INSPECTION REPORT <br /> <br />Architect: <br />Project Name: <br />Location: <br />Contractor: <br /> <br />RBK Architects, Inc. <br />East Pasco Medical Center <br />Zephyrhills, Florida <br />Doster Construction, Inc. <br /> <br />Date: <br />Job No.: <br />Report No.: <br />Permit No: <br /> <br />November 17,2004 <br />1214.167 <br />0.006 <br />2852 <br /> <br />Engineer: <br />Inspection By: <br /> <br />Master Consulting Engineers, Inc. <br />Robert L. Bell, E.I. <br /> <br />Items Inspected: <br /> <br />rJ Inspection of foundations along gridline 12 at E and F. / (1-8) / (11/12-E) / (E-11 & 12), <br />11 Inspection offoundation along gridline 10 at H. <br />lJ Inspection of foundation along gridline 8 at I. <br />[] Inspection of foundation along grid line E at 10 and 11. <br />[J Inspection of wall foundation steel along gridline D from 6 to 10. <br /> <br />Reinforcing quantity and type is in accordance with the contract documents and is acceptable for placement <br />of concrete in the inspected areas. <br /> <br />Pending Issues: <br /> <br />None at this writing <br /> <br />Respectfully submitted, <br /> <br />~IM <br />~../. ~'1 <br /> <br />Armand<> A Castellon, p-zj <br />Fl. Reg. # 43,453 <br />51 # 0931 <br /> <br />Cc: Zephyrhills Building Department <br />RBK Architects <br />Doster Construction, Inc [(1 )-Field Copy & (1) office copy] <br />File <br />