My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-2888
Zephyrhills
>
Building Department
>
Permits
>
2004
>
04-2888
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:25:21 PM
Creation date
1/24/2007 3:28:42 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Plan/Print
Permit #
04-2888
Building Department - Name
UNER,JO ANN
Address
5120 18TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.... <br /> <br />:/6"A: <br /> <br />~~~ <br /> <br />~,_ale ~(J.(J"1e9 <br />A Division of Ryman Construction, Inc. <br /> <br />~ JIJ UIhz/t <br />5/rd..O 11J'iV S~ <br />2-/7//ls; rL. <br /> <br />Date: <br /> <br />3/~3JOf <br /> <br />To: <br /> <br />IIj-O f) h-1L 3 0 Y't:7nL- <br />'Ue".,;"" ~O#,>-/ ft, -i /e, /J7V 1,\ <br />/s--yOhLt/17~r~/#--J , L~} <br />W~ry .t,WJ: ~TIJ <br /> <br />1. Complete tear off of exi~~ shingles <br />2. Roof dried in with # I r felt <br />3. Install new valley metal with galvanized metal <br />4. Re-secure all loose roof decking <br />5. Install all new lead boots through the roof <br />6. Install all new drJp,ylge around the perimeter of roof <br />7. Install all new c:<.c; year fungus-resistant shingle :J'- <br />8. All debris removed from the job site <br />9. All material and labor furnished <br /> <br />!fJ.);WC/"'diU ""t' --I-c:(., js-kh fJ/Y~ <br /> <br />1/.).:J;JcliA.d;S' 4// ;:i4-f 'M-c.t::-- /YU~ <br /> <br />m-6 <br /> <br /> <br />3-bL1O <br /> <br />or <br /> <br />tit? <br />Total bid price $ I.. j90tJ, <br />Extra's ~,.,t~ . <br />Bad plywood replaced at a cost of $ Ji. per slteet in tlte roof field. Allotlter wood work suclt as valley rebuilding or rafter replacement will <br />. '() <br />be a cltarge of $ ~ per man per Itour plus tlte cost of materials <br /> <br />All material is guaranteed to be as specified, and the above work to be done in accordance with the drawings and specifications submitted for above work <br />and completed in a substantial workmanlike manner for the sum of <br /> <br />With payment as follows: ~ ~htJj <br /> <br />Any alteration or deviation from above specifications involving extra costs, will be executed only upon written order. and will become an extra charge over and above the estimate. All agreements <br />contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado, and other necessary insurance upon above work. Workmen's compensation and public liability <br />insurance on above work to be taken out by Ryman Construction, Inc. <br /> <br /> <br />A"'Pt.n":~ ~ <br /> <br /> <br />The above prices, specifications and onditions are satisfactory and are hereby acce ted. You are authorized to do the work as specified. <br /> <br />Dollars ($ 3 ?t9a pt) <br /> <br />Date: Signature: <br /> <br /> <br />Ryman Construction, Inc. Will not b r ponsible for <br />any septic tank, sod, or shrubbery damage. <br />Payment due upon receipt of Invoice <br /> <br /> <br />Please nole: A charge of 1.5% will be made on all unpaid balances after 30 days. which is an annual percentage rate of 18% applied to past due balances <br /> <br />For your convenience we accept <br /> <br />-ClCi:I. <br /> <br />37325 s. R. 54 W. . ZephyrhiIls, Florida 33542 <br />(813) 782-6094. License # CCC-1325505 <br />
The URL can be used to link to this page
Your browser does not support the video tag.