My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-2889
Zephyrhills
>
Building Department
>
Permits
>
2004
>
04-2889
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:25:21 PM
Creation date
1/24/2007 3:30:08 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Plan/Print
Permit #
04-2889
Building Department - Name
CRETE,EDGAR
Address
38523 CAMDEN AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />..... <br /> <br />'/~..-: <br /> <br />~~~ <br /> <br />~illHale ~(J,(J,'tIe9 <br />A Division of Ryman Construction, Inc. <br /> <br />E {I/t"lA-7L (!~ 76J--~/ //3 <br />3 B 5'"'3;h C;If /n t:lR4J 4V<-<- <br />2-A~/h) n- 33)cfU <br /> <br />'7c.l 3/0 %{ (jj Jl <br /> <br />Date31 &J/t!f .,yO <br />--:Jf'A ( 'I e-c~ <br />a-3~f" ~,pO <br />- <br />/6k-L .~. ifZJ <br /> <br />To: <br /> <br />1. Complete tear off of existi..!Jg shingles <br />2. Roof dried in with # J f felt <br />3. Install new valley metal with galvanized metal <br />4. Re-secure all loose roof decking <br />5. Install all new lead boots through the roof <br />6. Install all new drip edge around the perimeter of roof ~ ~ , , ~ <br />7. Install all new 30 year fungus-resistant shingle ,(U4??/A/.uo,V",d-! (51t-6/et(.~ ) <br />8. All debris removed from the job site . c-~n...-?.J.": {(~ C <br />9. All material and labor furnished tJ 1d1-re;; ~r - <br />IO,):{NJ~.s ~ -fdC~)Sk.vl-j ;;/ywr>--/ <br />II:) ~c./~~(:J.. ") 10 I, G-,e.t/ <br /> <br />Total bid price $ <br />Extra's /' tJO <br />Bad plywood re~la~1'/,atrfttost of $ ~ per sheet in the roof field. All other wood work such as valley rebuilding or rafter replacement will <br />be a charge of $ ~ per man per hour plus the cost of materials <br /> <br />tfr!h9t) oiJ <br /> <br />All material is guaranteed to be as specified, and the above work to be done in accordance with the drawings and specifications submitted for above work <br />and completed in a substantial workmanlike manner for the sum of <br /> <br />With payment as follows: ~-x... ~~~ <br /> <br />Dollars ($ ~ tJO <br /> <br />Any alteration or deviation from above specifications involving extra costs, will be executed only upon written order, and will become an extra charge over and above the estimate. All agreements <br />contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado, and other necessary insurance upon above work. Workmen's compensation and public liability <br />insurance on above work to be taken out by Ryman Construction, Inc. <br /> <br />Resp~ctfullY ubmitted <br /> <br />Per - .~ <br /> <br />Acceptance of Propos <br />The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. <br />,'-j <br />I <br /> <br />Date: <br /> <br />Signature: <br /> <br /> <br />Ryman Construction, Inc. Will not be responsi e for <br />any septic tank, sod, or shrubbery damage. <br />Payment due upon receipt of Invoice <br /> <br />Please note: A charge of 1.5% will be made on all unpaid balances after 30 days, which is an annual percentage rate of 18% applied to past due balances <br /> <br />For your convenience we accept <br /> <br />_ C!C ill. <br /> <br />37325 S. R. 54 W. . ZephyrhiIls, Florida 33542 <br />(813) 782-6094 . License # CCC-1325505 <br />
The URL can be used to link to this page
Your browser does not support the video tag.