My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-2891
Zephyrhills
>
Building Department
>
Permits
>
2004
>
04-2891
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:25:20 PM
Creation date
1/24/2007 3:32:05 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Plan/Print
Permit #
04-2891
Building Department - Name
SCOTT,THOMAS
Address
4932/4934 4TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'.. <br /> <br />/~., >>.; <br /> <br />~~~ <br /> <br />3rcr <br /> <br />1< ,_all 1<(J.(J.ltIl9 <br />A Division of Ryman Construction, Inc. <br />To: ~ '~r; S'ev # <br />~f3 'f/ ,-!Z} ~:L, <I~ S~-L <br />2---h//h; /Z. <br /> <br />Date: :; Ii 1/ (Jtf <br /> <br />1. Complete tear off of existing shingles <br />2. Roof dried in with # I) felt <br />J. Install new valley metal with galvanized metal <br />4. Re-secure all loose. roof decking <br />5. Install all new lead boots through the roof <br />6. Install all new drip ~ge around the perimeter of roof <br />7. Install all new .~S year fungus-resistant shingle <br />8. All debris removed from the job site <br />9. All material and labor furnished <br />Ic;)!ffi'C/t,(~5 U1J ~r(.) (3J ~~ jJly~ <br /> <br />tj03{) (]V ~ <br />. .20~ <br />- Total bid price $ Yd-~ . <br />Extra's I L( rfO <br />Bad plywood replaced at a cost of $ ~ per slleet in tile roof field. All otller wood work sucll as valley rebuilding or rafter replacement will <br />be a cllarge of $~(,per man per IIour plus tile cost ofmaterials <br /> <br />All material is guaranteed to be as specified, and the above work to be done in accordance with the drawings and specifications submitted for above work <br />and completed in a substantial workmanlike manner for the sum of <br /> <br />Dollars ($ tf-~) ) <br /> <br />::t,:,:~:~.:::.:"::':::~.",~~::~..,, "0" ..;~ .m" MO wm b=m'.."~ ,.~, .'" ,.d '00", '~m~q" ~ <br /> <br />contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado. and other necessary insurance upon above work_ Workmen's compensation and public liability <br />insurance on above work to be taken out by Ryman Construction, Inc. <br /> <br />Per <br /> <br /> <br />~ <br /> <br />Acceptance of Proposal <br />The above prices, specifications and conditions are satisfactory and are hereby c epted. You a' authorized to do the work as specified. <br /> <br />Date: Signature: uJ (K <br /> <br />Ryman Construction, Inc. Will not be responsible for <br />any septic tank, sod, or shrubbery damage. <br />Payment due upon receipt of Invoice <br /> <br />Please note: A charge of 1.5% will be made on all unpaid balances after 30 days. which is an annual percentage rate of 18% applied to past due balances <br /> <br />For your convenience we accept <br /> <br />.alCiiI. <br /> <br />37325 S. R. 54 W. . ZephyrhilIs, Florida 33542 <br />(813) 782-6094. License # CCC-1325505 <br />
The URL can be used to link to this page
Your browser does not support the video tag.