My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-3016
Zephyrhills
>
Building Department
>
Permits
>
2004
>
04-3016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:24:51 PM
Creation date
1/25/2007 11:59:42 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
04-3016
Building Department - Name
CAR MORAN TRUSTEE
Address
39147 6TH AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I.l..: <br />'/~~ <br /> <br />~~ <br /> <br />I /1 y (,~(" -, u <br /> <br />~,_ale ~(J.(J."1e9 <br />A Division of Ryman Construction, Inc. <br /> <br />To ;;::? fi1/ <br /> <br />z E/',#j'~ An //5, k. <br /> <br />ft0M <br /> <br />Date: '1/7 ~ t/ <br /> <br />1. Complete tear off of existing shingles <br />2. Roof dried in with # / S felt <br />3. Install new valley metal with galvanized metal <br />4. Re-secure all loose roof decking <br />5. Install all new lead boots through the roof ) <br />6. Install all new drip.<:-dge aronnd the p~rimeter.of roof _ / ~ . S- ff1"r/ <br />7. Install all new ~ S year fungus-resistant shmgle 3 --./A- 6 {. O-e.:; r <br />8. All debris removed from tbe jOb site /. '/1-1 r. ::'U ~ c.....,("" <br />9. All material and labor furnished (/V ~ " _ <br /> <br />Total bid price $ <br />Extra's /"' CiO <br /> <br />Bad plywood replaced a.y cost of $ t/ S/ per slreet in tire roof field. All otlrer wood work suclr as valley rebuilding or rafter replacement will <br /> <br />be a clrarge of $ t(() (, per man per Irour plus tire cost of materials <br /> <br />d. /70, ,rtJ <br /> <br />All material is guaranteed to be as specified, and the above work to be done in accordance with the drawings and specifications submitted for above work <br />and completed in a substantial workmanlike manner for the sum of <br /> <br />With payment as folIows: ~'"Y(.. ~ <br /> <br />Dollars ($ &/70. tFO <br /> <br />Any alteration or deviation from above specifications involving extra costs, will be executed only upon written order, and will become an extra charge over and above the estimate, All agreements <br />,ontingcn! upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado, and other necessary insurance upon above work, Workmen's compensation and public liability <br />insurance on above work to be taken out by Ryman Construction, Ine, <br /> <br />Respectfully submitted <br /> <br />Per <br /> <br /> <br />7" <br /> <br />Acceptance of Proposal <br />Th, .hoyo P"'''. 'p"'fi"tio", .nd 'ond'tio", .re ''';,'''tory .nd = horehy. "fiCOPt'd. You = .uthorl"" to do th, wo,k " 'p,,'fiod. <br /> <br />Date: Signature: >( ~"~-.....--.l~, \r~ <br /> <br />Ryman Construction, Inc, Will not be responsible for <br />any septic tank, sod, or shrubbery damage, <br />Payment due upon receipt of Invoice <br /> <br />Please nole: A charge of 1.5% will be made on all unpaid balances after 30 days, which is an annual percentage rate of 18% applied to past due balances <br /> <br />For your convenience we accept <br /> <br />-a=iiI. <br /> <br />37325 S. R. 54 W. . ZephyrhilIs, Florida 33542 <br />(813) 782-6094 . License # CCC-1325505 <br />
The URL can be used to link to this page
Your browser does not support the video tag.