My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-3092
Zephyrhills
>
Building Department
>
Permits
>
2004
>
04-3092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:24:29 PM
Creation date
1/26/2007 9:24:59 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
04-3092
Building Department - Name
MATHEWS,TERRY
Address
5428 20TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'" <br /> <br />~"~ <br /> <br />~~~ <br /> <br />~ <br />To: le~ /l1h//'f(:;/;US <br />. <br />5 -, d.-041 S <br />2e.,oAyL-A/ //5, If, <br /> <br />..y:- ~ .~ ii,..,.6 s *-. <br />Date: 5/ sjd Y <br /> <br />1. Complete tear off of exis!!>>g shingles <br />2. Roof dried in with # / 5 felt <br />3. Install new valley metal with galvanized metal <br />4. Re-secure all loose roof decking <br />5. Install all new lead boots through the roof <br />6. Install all new d:? ~e around the perimeter of roof ..t.( . ) ___ ,G<!J <br />7. Install all new J year fungus-resistant shingle 3,-- 7" 4 ~ tv IJ.:'re- ( ~ <br />8. All debris removed from the job site wlh rC;-D~ (::/x=. <br />9. All material and labor furnished <br />IO.).f'Nt:'.~:S ,t}-/( ;V~ ~/( <br /> <br />Extra's <br />Bad plywood replaced at a cost of $ per slreet in tire roof field. All otlrer wood work suclr as valley rebuilding or rafter replacement will <br />be a clrarge of $ per man per Irour plus tire cost of materials <br /> <br />Total bid price $ <br /> <br />~ )'t9r!J/ ro <br /> <br />All material is guaranteed to be as specified, and the above work to be done in accordance with the drawings and specifications submitted for above work <br />and completed in a substantial workmanlike manner for the sum of <br /> <br />With payment as follows: ~ <br /> <br />~~ <br /> <br />Dollars ($ 6)&tJ< nJ ) <br /> <br />Any alteration or deviation from above specifications involving extra costs. will be executed only upon written order, and will become an extra charge over and above the estimate. All agreements <br />contingent upon strikes. accidents or delays beyond our control. Owner to carry fire, tornado. and other necessary insurance upon above work. Workmen's compensation and public liability <br />insurance on above work to be taken out by Ryman Construction. Inc. <br /> <br /> <br />A,,,prn.":~~ ~ <br /> <br /> <br />The above prices, specifications and conditions are satisfactory and are hereby accepted. You are aut~ori}1to do the work as specified. <br /> <br />D"" S;g."."" ,)( J~021 ~ <br /> <br />Ryman Construction, Inc, Will not be responsible for <br />any septic tank, sod, or shrubbery damage, <br />Payment due upon receipt of Invoice <br /> <br />Please note: A charge of 1.5% will be made on all unpaid balances alter 30 days, which is an annual percentage rate of 18% applied to past due balances <br /> <br />For your convenience we accept <br /> <br />-=iIJ. <br /> <br />37325 S. R. 54 W. . ZephyrhiIls, Florida 33542 <br />(813) 782-6094 . License # CCC-1325505 <br />
The URL can be used to link to this page
Your browser does not support the video tag.