My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-3167
Zephyrhills
>
Building Department
>
Permits
>
2004
>
04-3167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:24:09 PM
Creation date
1/31/2007 11:08:19 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
04-3167
Building Department - Name
MYERS,MARIAN
Address
6103 18TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, . <br /> <br />05-30388.01 <br />Page 2 of8 <br /> <br />Test Specimen Description: (Continued) <br /> <br />Test Specimen #2: H-LC40 44 x 77 <br /> <br />Over;3li Size: 3' 8" wide by 6" 5" high <br /> <br />Top Sash Size: 3' 3-13/16" wide by 3' 0-118" high <br /> <br />Bottom Sash Size: 3' 4-13/16" wide by 3' 1-118" high <br /> <br />Test Specimen #3: H-LC45* 44 x 60 <br /> <br />Overall Size: 3' 8" wide by 6" 5" high <br /> <br />Top Sash Size: 3' 3-3/4" wide by 2' 3-5/8" high <br /> <br />Bottom Sash Size: 3' 4-3/4" wide by 2' 4-5/8" high <br /> <br />Test Specimen #4: H-LC45* 36 x 72 <br /> <br />Overall Size: 3' 0" wide by 6" 0" high <br /> <br />Top Sash Size: 2' 7-13/16" wide by 2' 9-5/8" high <br /> <br />Bottom Sash Size: 2' 8-3/4" wide by 2' 10-5/8" high <br /> <br />Test Specimen #5: H-LC60* 36 x 60 <br /> <br />Overall Size: 3' 0" wide by 5" 0" high <br /> <br />Top Sash Size: 2' 7-314" wide by 2' 3-5/8" high <br /> <br />Bottom Sash Size: 2' 8-3/4" wide by 2' 4-5/8" high <br /> <br />The following descriptions apply to all specimens. <br /> <br />Finish: All vinyl was white. <br /> <br />Glazing Details: The sash were interior glazed with 13/16" thick, sealed insulating glass <br />fabricated from two sheets of 1/8" clear, annealed glass and a steel spacer system. The glass <br />was set onto a double-sided adhesive tape and secured with rigid vinyl glazing beads. <br /> <br />Frame Construction: The PVC frame was constructed using mitered and welded comer <br />construction. Rigid PVC snap-in adapters were located at head and sill. <br />
The URL can be used to link to this page
Your browser does not support the video tag.