Laserfiche WebLink
<br />. ! <br /> <br />SCHAPER <br /> <br />ROOFING, <br /> <br />INC. <br /> <br />8949 Gall Blvd. Zephyrhills, FL 33541 <br />PH: (352) 567-8580 & (813) 782-0920 Fax: (813) 715-4762 <br />STATE CERTIFIED BUILDING AND ROOFING CONTRACTOR #CB-C059817 and #CC-C058134 <br />Serving Florida's Finest Homes & Businesses since 1976 <br />Attn: S~ron Thomas <br /> <br />Name Car Quest Auto Parts . <br /> <br />Date 7/16/04 <br /> <br />Address 4718 Gall Blvd. <br /> <br />Phone 788-4810 <br />~ounty ]85CO "2. 14 <br /> <br />ZeohvrhiIls. FL 33541 <br />Parcel # )~ -~ l~ ~~I A OloD - () J l. 00 . OD'll> <br /> <br />We hereby propose to furnish materials and labor necessary for the completion of: <br /> <br />PVC CPA roofing system <br /> <br />1. Barricade offwork area as needed. <br />2. Remove Pan roof and pan roof framing. <br />3. Remove loose debris from :flat roof. <br />4. Remove existing :flashings and boots as required. <br />5. Check substrate decking for water damage. Replacement of decking will be done on a time and material <br />basis at the rate of $36.00 dollars per man -hour plus materials marked up a 25% contractors fee. <br />6. Install insulation, mechanically attached per manufacturers specification. <br />7. Install PVC CPA membrane for a 15-year material and labor warranty. <br />8. Install new boots, custom curb and comers as required. <br />9. Install two-way vents as required. <br />10. Install 2" drip edge and term bar as required. <br /> <br />Contractor warranty Upon completion of the work and payment of all monies owed. Contractor shall issue a <br />two (2) year warranty limited to leaks caused by any component install by the contractor. Manufactures shall <br />issue a fifteen (15) warranty on workmanship and materials. <br /> <br />General Conditions All work shall be carefully supervised and completed by workmen skilled and <br />knowledgeable in the methods needed to produce high quality work. The job site shall be kept clean daily for <br />the duration of the job and the grounds shall be left clean of all roof related debris after completion. The yard <br />shall be swept with a magnet. Collection costs if any together with interest shall be added to the contract price <br />ifpayment default occurs. Cancellation of the contract after the 72-hour grace period may incur a nominal fee, <br />The contractor shall provide permit, Workman compensation, and general liability insurance. Carpentry, <br />authorized change orders and work, which are not covered under the scope of work outlined herein, shall be <br />performed on a time and materials basis unless otherwise agreed upon. <br />