<br />VAl '1 ~
<br />
<br />\ ...J-- (, "-
<br /> FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION \.
<br /> , CHAPTER 4 - Commercial Building Compliance Methods
<br /> .
<br />FORM 400C-01 CENTRAL
<br />LImited and Special Use Buildings Climate Zones 4 5 6
<br />Project Name: Zone:
<br />Address: Building Classification:
<br />City, Zip Code: Building Permit No.:
<br />Builder: Permitting Office:
<br />Owner: Jurisdiction No.:
<br />
<br /> BUILDING INFORMATION
<br />WAUS I ROOF/CEILING FLOORS DOORS GLASS
<br />TYPE U 4REA TYPE U AREA TYPE U AREA TYPE U AREA TYPE U AREA
<br />Concrete ICBS\ ,IU /3 9 Under Attic at:' Ill.t:l Slab-on-orade ~ Wood Sinnle wall
<br />Wood frame I Sinole Assembly Raised Wood Metal '16 ?- t.l. Double, wall dt;K Ii Ii/)
<br />Metal frame "II" I"M,U Other: Raised Concrete Insulated Sino Ie roof
<br />Insulation R-value lor I Insulation R-value 1'/ Insulation R-value Other Double, roof
<br />
<br /> SYSTEMS INFORMATION
<br /> AIR CONDITIONER HEATING SYSTEM HOT WATER
<br />TYPE EFFICIENCY TONS TYPE EFFICIENCY BTUIH TYPE
<br />Unitary & Heat Pump !:L Central & Heat Pump Electric
<br /><65,000 Btuth lQ!:JSEER <65,000 Btu/h _ HSPF - Resistance 00
<br /><:65,000 Btu/h _EER _IPLV - <:65,000 Btuth .....L COP ~U Dedicated Heat Pump D
<br />Water cooled _EER _IPLV - Water cooled _COP - Gas
<br />Evaporatively cooled _EER - Evaporatively cooled _COP - Natural D
<br />PTAC _EER - Electric Resistance _COP " - LPG D
<br />Chiller _COP _IPLV - Gas/Oil (circle one) HRU D
<br />Gas heat pump _COP - <225,0001300,000 Btu/h _AFUE - Other: D
<br />Other: - - - <:225,0001300,000 Btu/h _Et -
<br />LIGHTING Total Ughting Wattage ~Y 0 171:. I SIZING CALCULATION I DUCTS R-value l..
<br />Total Condttioned Floor Area (({gO Watts/sq.ft. Attached 0 Location
<br />
<br /> PRESCRIPTIVE MEASURES (Must be met or exceeded by all buildings.)
<br />ComDonents Section Reauirements Check
<br />Ooerations Manual 102.1 Ooerations manual will be orovided to owner. \!
<br />Windows & Doors 406.1 Maximum: .3 cfm oar so.ft. of window area; Maximum: 1.2 cfm per sq.ft. of door area. 'f
<br />Joints/Cracks 406.1 To be caulked, gasketed, weatherstripped or otherwise sealed. V.
<br />Dropped Ceiling Cavtty 406.1 Vented: seal and insulate ceilino (no T-bar ceilinos). Unvented, no ceiling air barrier. seal and insulate roof and side walls. ;1/11
<br />Reheat 407.1 Electric resistance reheat prohibtted. ,11/-11
<br />Ventilation 409.1 Supplied wtth readily accessible swttch for shut-off and/or volume reduction when ventilation is not required. .'f..
<br />HV AC Efficiency 407.1,408.1 Minimum effICiencies - Heating: Tables 4-7, 4-8, 4-9. Cooling: Tables 4-3, 4-4, 4-5, 4-6. ,.;.
<br />HVAC Controls 407.1 Separate readily accessible manual or automatic thermostat for each system. ^
<br />HV AC Ducts 410.1 Air ducts, fittings, mechanical equipment and plenum chambers shall be mechanically attached, sealed, insulated
<br /> and installed in accordance wtth the crtteria of section 410.1. 'A
<br />Balancing 410.1 HVAC distribution system(s) tested and balanced. :x
<br />Piping Insulation 411.1 In accordance with Table 4-11. -"
<br />Water Heaters 412.1 Automatic electric storage water heaters :5:120 gallons and gas & oil fired storage water heaters :S:75,000 Btuth shall meel
<br /> performance requirements i1 Table 4-12. Electric> 120 gallons: standby loss :S:.~+27NT' Gas> 75,000, Oil> 105,000: E. .78, X
<br /> Standby 10ss:5: 1.30+114NT. Gas, Oil >155,000: E,.78 , Standby Ioss:5: 1.30+951VT.
<br />Swimming Pools 412.1 Spas & heated pools must have covers. Non-commercial pools must have pump timer. Gas spa & pool heaters must Nfl
<br />& Spas have a minimum thermal efficiency of 78%.
<br />Hot Water Pipe 412.1 Piping heat loss is Iimtted to the levels in Table 4-11 for circulating systems and the first 8' of pipe from a storage AI r}
<br />Insulation tank.
<br />Water Fixtures 412.1 Shower head water flow restricted to maximum of 2.5 gpm at 80 psi. Toilets meet 42CFR 6295(k). Public lavatory fixture /J1t
<br /> maximum flow of .5 gpm; or if self-closing valve, .25 gallon circulating, .5 gallon non-circulating.
<br />Lighting 415.1 Ballasts shall have Power Factors no less than .90. 'A..
<br />
<br />If required by Florida law, I hereby certify that the system design is in compliance wtth the Rorida Energy Code.
<br />ARCHITECT:
<br />ELECTRICAL SYSTEM DESIGNER:
<br />LIGHTING SYSTEM DESIGNER:
<br />MECHANICAL SYSTEM DESIGNER:
<br />PLUMBING SYSTEM DESIGNER:
<br />
<br />Compliance with Chapter 4 was demonstrated by a Prescriptive Measures methodology:
<br />
<br />Detached Buildings <200 sq.ft. D Convenience stores <5,000 sq.ft.
<br />Skyboxes/sports stadiums D Restaurants <5,000 sq.ft.
<br />Traffic safety control towers D Retail stores <5,000 sq.ft.
<br />
<br />Registration No.
<br />
<br />
<br />D
<br />D
<br />~
<br />
<br />Office buildings <5,000 sq .ft.
<br />School buildings <5,000 sq.ft.
<br />Storage buildings <5,000 sq.ft.
<br />
<br />D
<br />o
<br />D
<br />
<br />DATE:
<br />h the Rorida Energy Code.
<br />
<br />if - of-o(
<br />
<br />Review of plans and specifications covered by this calculation indicates compliance w~h
<br />the Florida Energy Code. Before construction Is co"1lleted, this building will be inspected
<br />for co"1lllance in accordance with Section 553.908, F.S.
<br />
<br />BUILDING OFRCIAL:
<br />
<br />DATE:
<br />
<br />OWNER AGENT:
<br />
<br />DATE:
<br />
|