Laserfiche WebLink
<br />City of Zephyrhills Construction Requirements <br /> <br />Survey markers shall be exposed for inspection of required minimum building setbacks. <br /> <br />Termite treatment is required with final treatment sticker being posted at water heater or <br />electrical panel. <br /> <br />Minimum 6" separation from finish grade to wood frame walls/siding required for slab <br />on grade construction. <br /> <br /> <br />~s <br /> <br />ALL WORKSHALLCOMFLY WITH ALL <br />PREY AlLING CODES, FLORIDA BUll.Dll\C <br />CODE NA TlONAL ELECTRlC CODE ANi. <br />CITY OF ZEPHYRHILLS ORDINA1':CES <br />