<br />Climate Zones 4 5 6
<br />TABLE 6C-,l : PRESCRIPTIVE REQUIREMENTS FOR SMALL ADDITIONS (600 Sq. Fland Laa), RENOVATIONS TO EXISTING BUILDINGS AND SITE.INSTALLED COMPONENTS OF MANUFACTURED HOMES.
<br />
<br /> M1NIMUN INSULATION
<br /> COMPONENT INSULATION INSTALLED
<br /> Concrete Block R-5
<br />en Frame, 2' x 4' R-ll
<br />....J Frame, 2' x 6' R-19
<br />....J
<br />~ Common, Frame R-ll
<br />Common, Masonry R-3
<br /> Under Attic R-30
<br />en Single Assembly; Enclosed
<br />C)
<br />z Frame R-19
<br />::J Metal Pans R-13
<br />jjj Single Assembly; Open R-l0
<br />0 Common, Frame R-ll
<br />en Slab-on-grade No Minimum
<br />a: Raised Wood R-ll
<br />0
<br />9 Raised Concrete R-5
<br />u.. Common, Frame R-ll
<br />u In unconditioned space R-6
<br />::> In conditioned space No minimum
<br />0
<br />
<br /> MINIMUM INSTALLED
<br /> EQUIPMENT EFFICIENCY EFFICIENCY
<br /> Central AlC - Split SEER = 10,0 SEER = -
<br />~ -Single Pkg. SEER = 9.7 SEER =
<br />:J -
<br />8 Room unit or PT AC EER = 8.5* EER = -
<br /> Electric Resistance ANY
<br />Cl Heat pump - Split HSPF = 6,8 HSPF = -
<br />z - Single Pkg. HSPF 6.6 HSPF
<br />~ = = -
<br />w Room unit or PTHP COP = 2.r HSPF/ =
<br />:J: -
<br />w COP
<br />S:f
<br />Cl.. Gas, natural or propane AFUE = ,78 AFUE =
<br />en -
<br /> Fuel Oil AFUE = .78 AFUE = -
<br />a: Electric Resistance EF = .88 EF = -
<br />S~ Gas; Natural or L.P. EF = .54 EF =
<br />:J:~ -
<br /> Fuel Oil EF = .54 EF =
<br />
<br />. See Table 6-3. 6-7
<br />
<br />
<br />Maximum
<br />
<br />1'- .87 0'- .78 2'- .87 1'- .78 3' - .87 2'- .78 4' - .87 3'- ,78
<br />0'- .75 1'- .75 0'- .61 2' - .75 1'- .61 3' - .75 2'- .61
<br /> 0'- .57 l' - .57 0'- .44 2' - ,57 1'- .44
<br /> 0' - .39 l' - ,39 0'- .35
<br />
<br />Get certified SHGC from the manufacturer or use defaults: Single clear SHGC = .87, double clear SHGC = .78, and single tint SHGC = .75.
<br />
<br />TABLE 6C-3 I MINIMUM REQUIREMENTS FOR ALL PACKAGES
<br />COMPONENTS SECTION REoUlREMENTS CHECK
<br />Exterior Joints" Cracks 606.1 To be caulked, aasketed weather-strinned or otherwise sealed.
<br />Exterior Windows" Doors 606.1 Max. 0.3 cfm/sa.ft. window area; .5 cfm/sa.ft. door area.
<br />Sole" TOD Plates 606.1 Sole olates and oonetrations throuah too olates of exterior walls must be sealed.
<br />Receaaed Uahtlna 606.1 Tvoo IC rated with no oanetrationsltwo alternatives allowed),
<br />Multl-storv Houses 606.1 Air barrier on oerimeter of floor cavitv between floors.
<br />Exhaust Fans 606.1 Exhaust fans vented to unconditioned space shall have dampers, except for combustion
<br /> devices with intearal exhaust ductwork.
<br />Combustion 606.1 Combustion space and water heating systems must be provided with outside combustion air,
<br />Heatlna exceot for direct vent annliances.
<br />Water Heatenl 612.1 Comply with efficiency requirements in Table 6-12. Switch or clearly marlc;ed circuit breaker (electric)
<br /> , ..,,,..t ~:. . I=vt....,..1 nr h"Ht.in heat traa' .. ri....r<>
<br />SwimmIng 612.1 Spas & heated pools must have covers (except solar heated). Non-commercial pools must have a
<br />'Pools" SOss oumo timer. Gas soa & 0001 heaters must have minimum thermal efficiency of 7~o.
<br />'+tot Water PI-- 612.1 Insulation is reauired for hot water circulatina svstems lincludina heat recovery units).
<br />;.Shawer Heads 612.1 Water flow must be restricted to no more than 2.5 aallons oar minute at 80 PSIG.
<br />.tNAC Duct 610.1 All ducts, fittings, mechanical equipment and plenum chambers shall be mechanically attached,
<br />I Cci1ri8tructlon, sealed, insulated and installed in accordance with the criteria of Section 610.1. Ducts in attics must be
<br />Inwtatlon " Installation insulated to a minimum of R~.
<br />HVAC Controls 607.1 Separate readily accessible manual or automatic thermostat for each system.
<br />
<br />GENERAl DIRECTIONS:
<br />1, On Table 6C.1 indicate the R-value of the insulation being added to each component and the efficiency levels of the equipment being installed, All R.values and efficieR:ies installed must meet or exceed the minilnurfrvalues1sted,
<br />Components and equipment neither being added nor reoovated may be left blank.
<br />2. ADDITIONS ONLY, Determi1ethe percentage of new glass to corllIIioned floor area in the a<kliOOn as follows, Total the areas of aI ~ windows, slicing ~ doors and ~ass door panels, Double the area ofalll1OlHellbltrool
<br />glass and add h to the previous total. When glass in existing exteriorwals is being reR1OI'ed or enclosed by the addition, an lIl1OUI1I equal to the total area of tt1s ~ may be SlbIracIed from the illaI ~ area, Divide.the &qusIed
<br />glass area total by the conditioned floor area of the acilition, MuflipIy by 100 to get the pen:ent, And thelargest glass pen:entage underwhicl1 yourcalculated peroentage fats on T able6C-2. PrescriptiYes are given bythe1)lle of glass
<br />(Single or Double pane) and the overhang (00) paired with a solar hear gain coefficient (SHGC), For a given glass type and overhang, the minimum solar heat gain coefficient allowed is specified. Actual glass windows and doors
<br />previO\JS~ in theexteriorwalls of the hoose and being reinstalled in the addition do not have to comply with the overhang andsolar heat gaincoefficient re<Jlirements on Table 6C-2. All new glass in the adlition must meet the requirement
<br />for one of the optionS in \he _ percentage ~ you indi:aled, The oveff1ang (OH) distance is measured perpendicularty from \he face of the glass to a poinldlreclty undertheoutennosl edge of !he oveff1ang.
<br />3, RENOV ATlONS ONLY. RepIa:ement ~ needs to meet the following requirements, Any glass type and mheat gain coefficient may be used for~ areas wt1ch are underat IeasI a two 1o?i oveIhang and who6e lowest edge
<br />does not extend furlherthan 8 feet from the oveIhang. Glass areas being rerovated that do not meet this criteria roost be either sige-pane tiied, 00ubIe-pa1e clear or double-pane tinted,
<br />4. BUILDING SYSTEMS. Comply when new system is installed for system installed.
<br />5. Complete the information requested on the top half of page 1.
<br />6. Read 'Minimum Requi'ements for Small Additions and Renovations', Table 6C-3, and check all app/ialIlIe items,
<br />7. Read, sig1 and date the 'Owner/Agenf cer1ificationstatemen1on page 1. _ 2 _
<br />
|