My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-3389
Zephyrhills
>
Building Department
>
Permits
>
2004
>
04-3389
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:23:01 PM
Creation date
2/1/2007 12:23:30 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
04-3389
Building Department - Name
TIBBS,HELEN
Address
38627 NORTH AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />~'Heale ~(J(J.1t1e9 <br />A Division of Ryman Construction, Inc. <br /> <br />To: <br /> <br />7J e le.A 'r, bh 5 <br />:<....q6~7 IVt?r+h AV~ <br /> <br />/~-I3J1 <br /> <br /> <br />~ <br /> <br />C 1f7'.A57/ ~ ~ ;:;~/-0 <br />.-;-hl \" /tdvc (JAJ 9.-8 --of <br />/1/5 D <br /> <br /> <br />1. Complete tear off of existing shingles <br />2. Roof dried in with # 1 c: felt <br />3. Install new valley metal with galvanized metal <br />4. Re-secure all loose roof decking <br />5. Install all new lead boots through the roof <br />6. Install all new drip edge around the perimeter of roof <br />7. Install all new .:c <' year fungus-resistant shingle .3... -\-0.... b (,~ K 0 ) <br />8. All debris removed from the job site <br />9. All material and labor furnished <br /> <br />10 't:(\c..\(.,'Il:~e.S M f-t:, .3 Sk, +s PI'llvoo("~ <br /> <br />Extra's <br />Bad plywood replaced at a cost of rlS- per slteet in tlte roof field. All otlter wood work suclt as valley rebuilding or rafter replacement will <br />he a cltarge of $-<) 0 per man per Itour plus tlte cost of materials <br /> <br />Total bid price $ <br /> <br />.5 3..;). -5~ n rJ <br /> <br />All material is guaranteed to be as specified, and the above work to be done in accordance with the drawings and specifications submitted for above work <br />and completed in a substantial workmanlike manner for the sum of <br /> <br />With payment as follows: ~ c.orv-PI'L-\...O"'\ <br /> <br />Dollars ($ 3~...s- D) <br />.0 <br /> <br />Any alteration or deviation from above specifications involving extra costs. will be executed only upon written order, and will become an extra charge over and above the estimate, All agreements <br />contingent upon strikes. accidents or delays beyond our control. Owner to carry fire. tornado, and other necessary insurance upon above work, Workmen's compensation and public liability <br />insurance on above work to be taken out by Ryman Construction, Inc. <br /> <br />Respectfully subm!,tted <br />/' ,/.... ~ ,;'~-""7 <br />pe~,.,;;~<::~/.s:;~ <br /> <br />Acceptance of Proposal -.-,,,,, --' <br />The above prices, specifications and conditions are satisfactory and are hereby accepted, You are authorized to do the work as specified. <br /> <br />Date: <br /> <br />Signature: <br /> <br />Ryman Construction, Inc, Will not be responsible for <br />any septic tank, sod, or shrubbery damage. <br />Payment due upon receipt of Invoice <br /> <br />Please nole: A charge of 1.5% will be made on all unpaid balances after 30 days, which is an annual pe.centage nile of 18% apptied 10 past due balances <br /> <br />For your convenience we accept <br /> <br />-ClCii:I. <br /> <br />37325 S. R. 54 W. . ZephyrhilIs, Florida 33542 <br />(813) 782-6094. License # CCC-J325505 <br />
The URL can be used to link to this page
Your browser does not support the video tag.