Laserfiche WebLink
<br />f/J'8''-'?d '1 J/ iJ fa 1-1 <br />SCHAPER ROOFING, INC. <br /> <br />8949 Gall Blvd. Zephyrhills, FL 33541 <br />PH: (352) 567-8580 & (813) 782-0920 Fax: (813) 715-4762 <br />STATE CERTIFIED BUILDING AND ROOFING CONTRACTOR #CB-C059817 and #CC-C058134 <br />Serving Florida's Finest Homes & Businesses since 1976 <br /> <br />Dean Johnston Music Studio <br /> <br />Date: _9/13/04 <br /> <br />38150 North Ave. <br /> <br />Phone: 782-4258 <br /> <br />Zephyrhills, FL 33542 <br /> <br />City/ County: <br /> <br />Parcel #: <br /> <br />We hereby propose to furnish materials and labor necessary for the completion of: <br /> <br />Shingle Reroof <br /> <br />1. For the shingled portions of the home, remove old roofing materials to dry-in, taking <br />precautions to protect the building and the landscaping. Groom .the deck and reset existing <br />decking nails. <br />2. Replace bad wood other than herein agreed for at _$38.50 _ per man-hour plus materials <br />marked up a _25%_ contractor's fee. <br />3. Install yainted _ eaves drip with all edges sealed with plastic cement. <br />4. Install_one _layer(s) of ASTM 15 lb. Asphalt shingle underlayment. <br />5. Install galv~ed valley metal for the length of all valleys. Valleys will be closed. <br />6. Install new lead boots over vent pipes and replace metal vents with new. <br />7. Chalk lines shall be struck to assure proper shingle exposure. Install_30_ year _3-tab <br />Class A self-sealing fungus resistant fiberglass shingles. Six 1 W' corrosion <br />resistant nails shall be installed per manufacturers instructions. <br />8. Shingle Manufactures: _ Certainteed Color _choice <br />Duro Last roof"mg system <br /> <br />~fi~ <br /> <br />1. Barricade offwork area as needed. <br />2. Remove loose debris from flat roofs. <br />3. Remove existing flashings and boots as required. <br />4. Check substrate decking for water damage. Replacement of decking will be done on a time <br />and material basis at the rate of $38.50 dollars per man -hour plus materials marked up a 25% <br />contractors fee. <br />5. Install fan fold insulation, mechanically attached per Duro Last specification and build roof <br />up for positive drainage. . <br />6. Install Duro Last membrane for a IS-year material and labor warranty. <br />7. Install new Duro Last boots, custom curb and comers as required. <br />8. Install Duro Last two-way vents as required. <br />