My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-3486
Zephyrhills
>
Building Department
>
Permits
>
2004
>
04-3486
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:22:32 PM
Creation date
2/8/2007 6:44:44 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
04-3486
Building Department - Name
MENHENNETT,STEVEN
Address
38749 5TH AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'" <br />:j .p;~ <br />~~~ <br /> <br />ie'lHt-41e iefJfJltle9 <br />A Division of Ryman Construction, Inc. <br /> <br />t k/Uj / a h,;v eAt <br />~N7, ~~ <br />,-A/15 h. <br /> <br />7lrZ-- 5'(" )-f <br />*' 9 - ()/;J., 9 <br /> <br />cdl <br /> <br />Date: /0// 11av <br /> <br />To: <br /> <br />1. Complete tear off of e/~ shingles <br />2. Roof dried in with # felt <br />3. Install new valley metal with galvanized metal <br />4. Re-secure all loose roof decking <br />5. Install all new lead boots through the roof <br />6. Install all new drip edge around the perimeter of roof , <br />7. Install all new 60 year fungus-resistant shingle f)//1o-I?,us,o;vfrl(6.u') /3//U:i-/{,A/7!)Odl <br />8. All debris removed from the job site \ t'" flfl / If <br />9. All material and labor furnished W;.H re~~ c .04 e- c... <br />io) ::r:;c.-/l-<~ S !Z".-/ 7;).e~~ /'1 <br /> <br />Extra's j I (',1?) <br />Bad plywood rePlq6~ cost of $ ~ per slreet in tire roof field. <br />be a clrarge of $ per man per Irour plus tire cost of materials <br /> <br />Total bid price $ <br /> <br />59~S;(3 <br /> <br />All otlrer wood work suclr as valley rebuilding or rafter replacement will <br /> <br />All material is guaranteed to be as specified, and the above work to be done in accordance with the drawings and specifications submitted for above work <br />and completed in a substantial workmanlike manner for the sum of <br /> <br />With payment as follows: ~"'Y'- ~J.-e':- <br /> <br /> <br />Any alteration or deviation from above specifications involving extra costs, will be executed only upon written order, and will become an extra charge over and above the estimate, All agreements <br />contingent upon strikes. accidents or delays beyond our control. Owner to carry fire, tornado, and other necessary insurance upon above work, Workmen's compensation and public liability <br />insurance on above work to be taken out by Ryman Construction, Inc. <br /> <br />Dollars ($ 59;J. 5"; dtJ <br /> <br /> <br />Per <br /> <br />4- <br /> <br />Date: <br /> <br />Ryman Construction, Inc. Will not be re onsible for <br />any septic tank, sod, or shrubbery damage. <br />Payment due upon receipt of Invoice <br /> <br />Please note: A charge of 1.5% will be made on all unpaid balances after 30 days, which is an annual percentage rate of 18% applied to past due balances <br /> <br />For your convenience we accept <br /> <br />.ClCi:I. <br /> <br />37325 S. R. 54 W . Zephyrhills, Florida 33542 <br />(813) 782-6094. License # CCC-1325505 <br />
The URL can be used to link to this page
Your browser does not support the video tag.