Laserfiche WebLink
<br />1 Underlayment: Standard Slope 4112 (333mm/m) or more <br />Application of uldlrlaylnelt Cover deCk with one layer of underlayment installed without <br />wrinkles, Use only enough nails to hold underlayment in place until COYered by shingles, <br />Application of lavl <<aslllng: Install eave flashing such as GAfMC Weather Watch" or <br />StormGuard"leak Barrier in localities where leaks llIaI be caused by water backing up behind <br />ice or debris dams. Eave flashing must overhang the roof edge by 318' (1Omm) and extend 24" <br />(610mm) beyond the inside wall line, <br /> <br />4' (102mmll::::::::::,., <br />12' (305mm) <br />MOlinurn Slope. <br />For lower slopes, 8ee Box 1 a. <br /> <br /> <br />/~f,.~~. ~ <br />...~ <br />,. 318" (1 Omm)Rool Ooterhang <br />2" (51mm) Side Up <br /> <br />Along rake, place <br />drip edge 00 top <br />olrnd&rtaymenl <br /> <br />Along""",," put underIayrnant <br />on lop (j metal drip edge, <br /> <br />2 <br /> <br />Starter Course <br />Apply as shown. <br /> <br />Start at either rake and <br />lay 11 _ dil'fJdioo <br /> <br /> <br />For m8)!imom wind fesi&tar.ce <br />along ,.n, cement shingles <br />to undertaymel'lt and each <br />other in a 4" (102mm) width <br />of uphllJt plastic roof cement. <br /> <br />!anr ~;~21,;:)) <br />1rom end of <br />first shingle <br /> <br />4 Second and Subsequent Courses <br />Start the second course With a shingle that has a half tab removed. Continue the <br />subsequent courses by removing labs as follows: Illird course trim full lab. fourth course <br />trim 1-1/2 ~$, fifth course trim 2 labs. sixth course vim 2-112 tabs, Strike a chalk line every six <br />courses to check for alignment to the eave edge. Begin seventh course with a full shingle, and <br />repeat the pattern above for subsequent courses. <br /> <br />NOTE: Shingles oiay be laid from either <br />left or right hand side. Start at either rake <br />edge with shingles having 6" (l52mm) <br />trimmed from rake, <br /> <br /> <br />6 Wall Flashing (Sloped Roof to Vertical Wall) <br /> <br />Sheathing 11- Siding <br /> <br /> <br />5" (i27mrn) Min, <br /> <br /> <br />1 Melal Flashing <br />T (Nailed to the deck. not to vertical &ide wall) , <br /> <br /> <br />Cap Shinale-{)o Not Nail, <br />___Install willi Roofing Cement <br /> <br />~ Rooting Cement <br />_Shingle <br />_ Roof Deck <br /> <br />48 Underlayment: Low Slope 2/12-4112 (167mm-333mm/m) <br />., AppIIc:IIIOI oIlIIIIBrIayInett nll.VII .......g: Completely cover the deCk with two <br />layers of under/ayment as shown, Use only enough nails to hold underlayment in place <br />until covered by shingles, Use blind nailing for eave flashings. At eaves and where ice dams can <br />be expected, use one layer of GAfMC Weather WatcIT" or StormGuard'" leak Barrier. Eave flash- <br />ing must overhang the roof edge by 3/8' (10mm) and extend 24" (610mm) beyond the inside <br />wall line, Where ice dams or debris dams are not expected. install 2 plies of Shingle-Mate' <br />under/aymen!. <br /> <br />L.... slope <br />(S1mmtot~; ~ <br />12" (305mm) <br /> <br /> <br />AlI_llI8 3ll' (el4lmli <br />wide Slmgle-Mate" <br />l.I1detIaymenl j <br />Rake drip edge <br />MI" (1lnlm) Rool-.hang <br /> <br />3 <br /> <br />First Course <br />Start and continue with full shingles laid flush with the starter course, Shingles may be <br />laid from left to right or right to left. DO NOT Jay shingles straight up the roof since this <br />procedure can cause an incorrect color blend on the roof and may damage the shingles, <br /> <br /> <br />Continue <br />fiMlt oourae <br />wilhwholoot <br />..,in-;)1e6 <br /> <br />Slart'lrs:l coon,eld'l wt'Ide SlW'TgIe paced <br />3If1' ilOmm.OV8" MVe2J'ldrakeadgH <br />t. P""'do '*'p edge <br /> <br />5 <br /> <br />Hip and Ridge <br />Use GAfMC hip & ridge shingles, or cut hip & ridge shingles from Illesefull shingles. and <br />app/y as shown, Position laps away from prevailing wind direction, <br /> <br />Cut shingle to make th,ee <br />12" (305inm). 12" (305mm) <br />hip & ridge shingles <br />from eaCh st~ <br /> <br />, , <br />. , <br />.. <br />..f........ <br /> <br /> <br />Nail 5 5/8" (l43mm) <br />aboIIe bull. I' (25mm) <br />from edge <br /> <br />Bend hip & ridaesAinp!e <br />centered ove, lllp 0' ndge <br /> <br />Apply laps awwy from <br />prevailing wind direction <br /> <br />S" (127mm) exposure <br /> <br />7 Chimney Flashing <br /> <br /> <br />~"""'base_g. <br />0.* plee. step fIIIIfIhIng kit Mdt ooura. <br />Gernert in place and nail wih 2 rliIils. <br />!Sond OtJetying shingll!t5 In aephal <br />-- <br />