Laserfiche WebLink
<br />~ <br />/' <br />~ , 'A.; <br /> <br />~L~ <br /> <br />~ <br /> <br />~'fma". ~(J(J1t"'9 <br />A Division of Ryman Construction, Inc. <br /> <br />- <br /> <br />7r~ <br /> <br />~J ~],-= <br /> <br />Date: cr .- \~ - ci <br /> <br />To: ~e...+-t-l \.h;\..r"r\~~ <br />~ PI +" ,S'~. <br />2-\--,I\S <br /> <br />wA-:J.~ -1 <br /> <br />;;).5 S. 00 ~! <br /> <br />1. Complete tear off of existing shingles <br />2. Roof dried in with # \~ felt <br />3. Install new valley metal with galvanized metal <br />4. Re-secure all loose roof decking <br />5. Install all new lead boots through the roof <br />6. Install all new drip edge around the perimeter of roof <br />7. Install all new ;;l.~ year fungus-resistant shingle 3~~q1 <br />8. All debris removed from the job site <br />9. All material and labor furnished <br /> <br />30 <br /> <br />--I~ <br /> <br />~ ~ fV\.(.'\S, a~ '"\. \ <br /> <br />~~:k, (TPw\ \-::() \ <br />Dr-n:~ e&.!)-e., Co \ 0)- ~ I ~ <br />R I' J. 'j€.- c/ -?.~ CO I 0" <br /> <br />Total bid price $ <br />Extra's <br />Bad plywood replaced at a cost of $4-:r"'" per sheet in the roof field. All other wood work such as valley rebuilding or rafter replacement will <br />be a charge of $$- per man per hour plus the cost of materials <br /> <br />"- <br />~ J!:C90 I {90 <br /> <br />All material is guaranteed to be as specified, and the above work to be done in accordance with the drawings and specifications submitted for above work <br />and completed in a substantial workmanlike manner for the sum of <br /> <br />With payment as follows: <br /> <br />Dollars ( ~ V =7 <br /> <br />Any alteration or deviation from above specifications involving extra costs, will be executed only upon written order, and will become an extra charge over and above the estimate, All agreements <br />contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado, and other necessary insurance upon above work, Workmen's tion and public liability <br />insurance on above work to be taken out by Ryman Construction, Inc. <br /> <br />Respec'j?b;itt~. <br />pe~ <br /> <br />Acceptance of. roposal <br />The above prices, specifications and conditions are satisfactory and are e <br /> <br />Date:j),:t- ::20 - dEJEJ'-I <br /> <br /> <br />o sible for <br />any septic tank, sod, or shrubbery age, <br />Payment due upon receipt of Invoice <br /> <br />Please note: A charge of 1.50/0 will be made on all unpaid balances after 30 days, which is an annual percentage rate of 18% applied to past due balances <br /> <br />For your convenience we accept <br /> <br />- ClCiCI_ <br /> <br />37325 S. R, 54 W. . ZephyrhiIls, Florida 33542 <br />(813) 782-6094. License # CCC-1325505 <br />