Laserfiche WebLink
<br />'" <br /> <br /> <br />~;~ <br /> <br /> <br /> <br />. <br /> <br />i!!.~ e~, 'lite. <br /> <br />Roofing Division <br /> <br />00,;).1,.5" ~/~ <br /> <br />To: )="\Ore....f"'><-~ L,......+-fte_/\\ OL} <ot. <br />:s 9.s-11 1 +-'-' ,4Ve... I <br />..7 ~\..., \\..5. FL. <br /> <br />Date: 11-)' - o-<{ <br /> <br />* p,.c <.. ""1:Ac...\....J u <br />oF ~ \ J. s e.- v.e..'\+-. <br /> <br />b 0 -t"l- . <br /> <br />1. Complete tear off of existing shingles <br />2. Roof dried in with # 3 0 felt <br />3. Install new valley metal with galvanized metal <br />4. Re-secure all loose roof decking <br />5. Install all new lead boots through the roof <br />6. Install all new drip edge around the perimeter of roof <br />7. Install all new 30 year fungus-resistant shingle D; 'V"\t..~ i O."\G\ \ <br />8. All debris removed from the job site <br />9. All material and labor furnished <br /> <br />~.U~\hr "'-'':;0& <br />Ct:\ K.) <br /> <br />Extra's <br />Bad plywood replaced at a cost of $-4 5' per slteet in tlte roof field. <br />be a cltarge of $4 0 per man per Itour plus tlte cost of materials <br /> <br />Total bid price $ ~O 4}00. 00 <br /> <br />All otlter wood work suclt as valley rebuilding or rafter replacement will <br /> <br />All material is guaranteed to be as specified, and the above work to be done in accordance with the drawings and specifications submitted for above work <br />and completed in a substantial workmanlike manner for the sum of <br /> <br />With payment as follows: uP 0" c....o", P I<'-\-I ~ <br /> <br />Dollars ($ <br /> <br />Any altemtion or deviation from above specifications involving extra costs. will be executed only upon written order. and will become an extra charge over and above the estimate. All agreements <br />contingent upon strikes. accidents or delays beyond our control. Owner to carry fire. tornado. and other necessary insurance upon above work. Workmen's compensation and public liability <br />insurance on above work to be taken out by Ryman Construction, Inc. <br /> <br />R"P"d'2 <br />p~ .' <br /> <br />Acceptance of Proposal <br />The above prices, specifications and conditions are satisfactory and are ~racc.epted. You are authori~~/o do t~7 work as specified. <br /> <br />Date: / ) - ) J. d r; Signature:' -7 _.j >"7 .:.e ..JtA~ c--. // c?-~ c.J.., c...<<::.' <br />. ----/ ./: <br />Ryman Construction, Inc. Will not be responsible for <br />any septic tank, sod, shrubbery or paint damage. <br />Payment due upon receipt of Invoice. <br /> <br />Please note: A charge of 1.5% will be made on all unpaid balances after 30 days. which is an annual percentage rate of 18% applied to past due balances <br /> <br />For your convenience we accept <br /> <br />_==iCI_ <br /> <br />37325 S. R. 54 W. . Zephyrhills, Florida 33542 <br />(813) 782-6094. (866) 993-7663. License # CCC-1325505 <br />