My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-3619
Zephyrhills
>
Building Department
>
Permits
>
2004
>
04-3619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:21:50 PM
Creation date
2/8/2007 11:11:28 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
04-3619
Building Department - Name
UNITED METHODIST CHU
Address
38635 5TH AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />11/16/2004 10:37 AM FROM: Fax TO: 779-7633 PAGE: 001 OF 001 <br /> <br />~- <br />e <br /> <br />ATT. PATRICK <br /> <br />--------------------------------- PIt()P()~A~------------------------------------ <br /> <br />PA~CO FENCE COMPANY <br />4254 Plwn Street <br />Zephyrhills, FL 33542 <br />(813) 788-5642 <br /> <br />PROPOSAL SUBMITTED TO: <br />First United Methodist Church <br />ADDRESS: <br />38635 5 tho Ave. <br />CITY: <br />Zephyrhills. Fl. <br /> <br />DATE: <br /> <br />PHONE: <br /> <br />11115/04 <br />782-5645 <br /> <br />We hereby submit specifications and estimates for: <br />187 ft. of 10' X 9 ga. Chain Link Fence arOlmd basketball court with 1- 7' x 3' gate. <br />SET BACKBOARD POSTS <br /> <br />CONSISTS OF: <br />10' x 9 ga. Chain Link Fabric. <br />1 5/8" x 16 ga. top & Bottom Rail. <br />2 3/8" x Sch. 40 Line and Comer Posts. <br />3" x Sch. 40 Gate Posts. <br /> <br />We Propose hereby to furnish materials and labor - complete in accordance with the above specifications for the sum of: <br /> <br />Three Thousand Two Hundred Fifty Dollars........................................... .$3.250.00 <br />paymcm. to be made as follows: <br />$900.00 DOWN PAYMENT. <br /> <br />$ 1.750.00 SECOND PAYMENT AFTER POSTS ARE SET. <br /> <br />$600.00 BALANCE DUE UPON COMPLETION OF JOB. <br />All material is guaranteed to be as specified. All work to be completed in a workmanlike /1llIlIIlCf according to standard practices. Any alteration <br />or deviation from above specifications involving extn costs will be exccutcd only upon written ordcr.;. and will become an extra charge OV1:f and <br />above the estimate. All agrccmetU contingent upon strikes, accidents or delays beyond our conlroL <br />Note: This proposal may be with(hwn by us ifnol accepted within ~days. <br />Authorized <br /> <br />signa/llre ~ ~ <br /> <br />Acceptance of Proposal- The above prices, specifications and conditions are satisfactory and are hereby <br />accepted. You are authorized to do the work as specified. Payment will be made as outlined above. <br /> <br />Signature: Pabi L,j, ~L C~tZrL <br /> <br />Date of accepmnce: II /11104. <br />
The URL can be used to link to this page
Your browser does not support the video tag.