Laserfiche WebLink
<br /> <br />.~+ ~'?l\3.a\~lf <br /> <br />1~IV~I~~ <br />12()()'lna ~e..."lees line. <br /> <br />770 NORTH GROSSE AVENUE · TARPON SPRINGS, FLORIDA 34689 <br />(727) 938-9565 · FAX (727) 934-6793 <br /> <br />ESTIMATE. CONTRACT <br /> <br />September 30, 2004 (revised) <br /> <br />en <br />I- <br />en <br />:J <br /><t <br />(3 <br />W <br />0.. <br />en <br />Cl <br />z <br />u: <br />o <br />o <br />a: <br />. <br />w <br />a: <br />~ <br />z <br />o <br />i= <br />o <br />::J <br />a: <br />I- <br />en <br />z <br />o <br />o <br />3: <br />w <br />z <br /> <br />Heartland of Zephyrhills <br />C/o Manor Care, Inc, <br />Attn: Mark Green <br />38220 Henry Drive <br />Zephyrhills, FL <br />727 -534-8997 <br /> <br />Job Location: Same <br />RE: Main roof, garage roof & shed roof <br /> <br />We propose labor and materials to: <br />1,) Remove existing shingle roof down to the decking. <br />2,) Dry in the roof with 1 layer(s) #30 asphalt saturated felt and mechanically fasten <br />with 1" simplex, <br />3.) Install all new drip edge. Available in galvanized, white or brown, <br />Color: (initial) <br />4,) Install all new valley liners with 26-gauge 16" valley metal. <br />5,) Replace any corroded flashing as necessary and seal all flashing with roof cement <br />6,) Remove and install all new lead shields and gooseneck exhaust vents, <br />7,) Install aluminum ridge vent for proper ventilation, <br />8,) Install 30-year Dimensional fungus resistant class A rated shingle, <br />Color: (initial) <br />9,) All installation to conform to State and local codes, <br />10,) Clean up and dispose of all roofing debris from rooftop and grounds, <br />11.) Permit, dump fees, workers compensation, general liability and taxes included in <br />total price, <br />12.) 5-years 100% workmanship guarantee within the scope of this contract The <br />written limited warranty in this proposal and contract is the only warranty given by <br />Arry's Roofing Service, Inc. <br />13,) All Manufactures written warranties, (GAF Timberline 30) <br />14,) The customer shall be responsible for any additional work, materials and/or <br />expenses for any work not specifically noted in this Contract The customer shall <br />provide the request for additional work by written order, which will be considered <br />for additional charge, <br /> <br />Subtotal price: <br /> <br />$ 96,900.00 (plus wood work, if any) <br /> <br />Arry's Roofing will inspect decking, fascia board, soffit and kick strip for any rotten or damaged wood, if any, it <br />will be replaced at an ADDITIONAL cost to the contract price above. Materials will be billed at our cost plus <br />labor at $42.00 per man, per hour. 20 sheets of plywood included in the above price. Anything over the <br />20 will be billed accordingly. <br /> <br />EXCLUSION FOR WOODWORK: Cost of woodwork does not include any damages discovered caused by <br />termites or structural damage. Examples: trusses, beams or bearing walls. Owner to be responsible for <br />painting any replaced wood, <br /> <br />Slale Lie.' RC0046643 <br /> <br />ORIGINAL. To Be Returned To Arry'. Roofing Service., Ine, Tarpon Spring., Florida <br />DUPLICATE. To Be Retained By Cu.tomer <br /> <br />CD <br />