Laserfiche WebLink
<br />FRO~1 : r- I T'r'-YARD <br /> <br />FAX NO. :8137800025 <br /> <br />Oct. 12 2004 09:24AM P3 <br /> <br />, <br /> <br />SCHAPER <br /> <br />ROOFING. IHe <br /> <br />8949 Gall Blvd. Zephyrhills. Florida 33541 Phone: 813-782.0920 Fax 813-715-4875 <br />STATE CERTIFIED BVILDNG AND ROOFING CONTRACTOR it CC-cO!S8134 CD-C059817 <br />SalVing Florida's Finest Homes & Business Since 1976 <br /> <br />Atnl: Shane <br /> <br />Name City of Zcphyrhills <br /> <br />Date _10/01/04 <br /> <br />Addross <br /> <br />Phone <br /> <br />City/County <br /> <br />Parcel # _ WW II Barracks roof damage by Je.:ln. <br /> <br />Supply labor, materials, aftd !lupervlsloll. 118 needed to: <br /> <br />Remove dama2ed nanels from roof 16' x 4f>' ttrca. Install thm.I!2Ynd drY-in. Install new 1 x 4 pt not <br />oaintcd to edge detail where missing. Install flew S v crimp metu126 ga gal". Screwed down with neoprene <br />washer. <br /> <br />Walk the bottom of r.he rest of the roof and re-secure the edues tl!!l.have lifted up. <br /> <br />GENERAL CONDITIONS: All work sh~ln be carefully supervised and completed by workmen <br />skilled <md knowledgeable in methods needed to produce high quality work. The job SltO shall be kept <br />c lean daily for the duration of the job and the grounds shall be left clean of all roof related debris after <br />completion. The yard shall be swept with a magnet. Collection costs if any, together with interest <br />shall be added to the contract price ifpaymcnt default occurs. Pc:rmit, Workman Compensation, and <br />General Liability insurance shall be provid~d by the Contractor. carpentry, authorized change orders <br />and work which is not covered under the scope of work outlined herein shall be perfonned on a time <br />and materials basis unless otherwise agreed upon. <br />