My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-3678
Zephyrhills
>
Building Department
>
Permits
>
2004
>
04-3678
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:21:30 PM
Creation date
2/8/2007 12:18:02 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
04-3678
Building Department - Name
ZEPHYR BOTTLED WATER
Address
4330 20TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Submittal Data Transmittal <br /> <br />THE HASKELL COMPANY <br /> <br />Specification Section <br />2000 <br /> <br />ARCHITECTURE .eNGINfERING .CONSTRUCTION .REAL eSTATE SERVICES <br /> <br />Shaded areas to be completed by The HaskeJ/ Company <br />Project Number: 32616301 Project Name: ZephyrhillsSecurityUpgrades <br />Project Location: Zephyrhills, FL Project Manager: <br /> <br />FileNo: <br /> <br />Date:. # 1~6/tY-I <br />I <br /> <br /> TO BE COMPLETED BY SUBCONTRACTOR OR MATERIALS SUPPLIER <br />Submitted by (print company name): <br />Item # of Copies Submittal Description <br />Number Sent Submittal Type <br />1 1 Shop Drawings Ornamental Fence & Gates <br /> I hereby certify this submittal data has been reviewed and approved prior to submission to The Haskell Company <br /> and the information contained within this submittal has been checked and coordinated with the requirements of <br /> the Work and the Contract Documents. Action indicated on this submittal by The Haskell Company does not <br /> relieve the siqner of any contractual obliqations and responsibilities <br />Reviewed & Approved by: <br /> Signature Printed Name <br /> <br />Reviewed by: <br /> <br />SEQ. <br /> <br />ROUTE TO <br /> <br />Architectural <br />Civil <br />Structural <br />Mechanical <br />Plumbing <br />Refridgeration <br />Electrical <br />Consultant <br />Quality Assurance <br />Specialist <br />Project leader <br />Project Manager <br /> <br />TO BE COMPLETED BYTHEHASKELL COMPANY <br /> <br />Date Submitted to AlE: <br /> <br />Date Required back from AlE: <br /> <br />PERSON <br />Ga Walo <br />Mike Wheeler <br /> <br /> <br />Peter Skirbst <br />Tom Osborne <br /> <br /> <br />REMARKS: <br /> <br />r~:~~;:.:};;;';'~ii'i;;;:;- _u___ <br />: I <br />i No. of Copies Received I <br />, <br />, <br />: Date Returned to P.M. <br />, <br />, <br />: No. of Copies Returned: <br /> <br />,-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-. <br />i Submittal Types I <br />i AS As-Built PO Product Data I <br />i CA Calculations SA Samples I <br />. I <br />I MC Material Certs SC Schedule I <br /> <br />I MO Mix Designs SO Shop Drwgs I <br />10M 0 & M Manual TR Test Reports I <br />! v I UUl~1 YVM. VVolli::tll1t:U:t I <br /> <br />l._._~~._._._._._._.___._._._._.~ <br /> <br /> <br />*STATUS KEY <br /> <br />1 No Exceptions Taken <br />2 - Make Corrections Noted <br />3 Revise & Resubmit <br /> <br />Revised 5/1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.