Laserfiche WebLink
<br />/-' . <br />::7 <br /> <br />.: <br /> <br />""" <br /> <br />:/~ <br />~~~ <br /> <br /> <br />. <br /> <br />~~ e~, 'lite, <br />Roofing Division <br /> <br />To: -.S -+e V <- ~ IlJ'-~'-i '''J ~'^ q <.-1 <br />0;)..d-- _t) S:) V.()'- O~ '-'\ ))r <br />2. -~.\\5 r-: L <br />J <br /> <br />001/. ~a.-'3.,J ~5 <br />Date: 11- \ 1- 01 <br /> <br /> <br />] - 'T~b ~h,/\ I~ <br /> <br />,00 <br /> <br />1. Complete tear off of existing shingles <br />2. Roof dried in with # 30 felt <br />3. Install new valley metal with galvanized metal <br />4. Re-secure all loose roof decking <br />5. Install all new lead boots through the roof <br />6. Install all new drip edge around the perimeter of roof <br />7. Install all new 30 year fungus-resistant shingle)), rr- ~~ I O"\C'\. \ <br />8. All debris removed from the job site <br />9. All material and labor furnished <br /> <br />C:lk. <br />( H"'-'r\ort) <br /> <br />M,'k J.r<~ ~.9~ <br /> <br />Extra's <br />A ...-' <br />Bad plywood replaced at a cost of s-1 t:> per sheet in tire roof field. All other wood work such as valley rebuilding or rafter replacement will <br />be a charge of $ ~O per man per hour plus the cost of materials <br /> <br />Total bid price $ 10. ~ 5"0. 00 <br /> <br />All material is guaranteed to be as specified, and the above work to be done in accordance with the drawings and specifications submitted for above work <br />and completed in a substantial workmanlike manner for the sum of <br /> <br />With payment as follows: l}JJo n c..ON\ ~\ e..:.\-\ CY\ <br /> <br />Dollars ($ <br /> <br />Any "Iteration or deviation from above specifications involving extra costs. will be executed only upon written order. and will become an extra charge over and above the estimate. All agreements <br />contingent upon strikes. accidents or delays beyond our control. Owner to carry tire. tornado. and other necessary insurance upon above work. Workmen's compensation and public liability <br />insurance on above work to be taken out by Ryman Construction, Inc. <br /> <br />Respect~~~ed __ _ <br /> <br />pe~ <br /> <br />Acceptance of Proposal <br />The above prices, specifications and conditions are satisfactory and are hereby acce <br /> <br />Date: ,) ?-c 2;A 'I Signature: <br /> <br />Ryman Construction, Inc. Will not be responsibl or <br />any septic tank, sod, shrubbery or paint damage. <br />Payment due upon receipt of Invoice. <br /> <br /> <br />Please note: A charge of 1.5% will be made on all unpaid balances after 30 days. which is an annual percentage rate of 18% applied to past due balances <br /> <br />Fo, your convenience we accept <br /> <br />_ C!C .ii:I III <br /> <br />37325 S. R. 54 W. . Zephyrhills, Florida 33542 <br />(813) 782-6094. (866) 993-7663. License # CCC- 1325505 <br />