My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-3817
Zephyrhills
>
Building Department
>
Permits
>
2005
>
05-3817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:46:35 PM
Creation date
2/16/2007 9:25:26 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
05-3817
Building Department - Name
CRYSTAL SPRINGS MOTO
Address
6736 GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />( <br />SCHAPER ROOFING, INC. <br /> <br />8949 Gall Blvd. Zephyrhills, FL 33541 <br />PH: (352) 567-8580 & (813) 782-0920 Fax: (813) 715-4875 <br />STATE CERTIFIED BUILDING AND ROOFING CONTRACTOR fCB-C059817 and fCC-C058134 <br />Serving Florida's Finest Homes & Businesses since 1976 <br />Attn: Ms Kathy Beasman <br /> <br />Name _Crystal Springs Motor fun <br /> <br />Date _12/14/04 <br /> <br />Address _6736 Gall blvd. <br /> <br />Phone _813-782-1214f991-5476 <br /> <br />Zeohvrhills. FL 33542 <br /> <br />City/County <br /> <br />Parcel #_Damage done during Tropical Storm Frances. 4 buildings ~9~d re-roofrequired. <br /> <br /> <br />We hereby propose to furnish materials and labor necessary for the completion of: <br /> <br />Shingle Re-roof <br /> <br />1. F or the shingled portions of the home, remove old roofing materials to dry-in, taking precautions to protect the <br />building and the landscaping. Groom the deck and reset existing decking nails. <br />2. Replace bad wood other than herein agreed for at _$38.50 _ per man-hour plus materials marked up a <br />_25%_ contractor's fee. <br /> <br />3. Install white <br /> <br />eaves drip with all edges sealed with plastic cement. <br /> <br />4. Install two layer(s) of ASTM 15 lb. Asphalt shingle undedayment. <br />5. Install galvanized valley metal for the length of all valleys. Valleys will be closed. <br />6. Install new lead boots over vent pipes and replace metal vents with new. <br />7. Chalk lines shall be struck to assure proper shingle exposure. <br />8. Install_20_ year _3-tab Class a self-sealing fungus resi~berglass shingles. <br />Manufacturer: _ Certainteed Color: _choice ,..;/ d If' I ~ ~ P 7' 7"-' <br />9. Six 1 W' corrosion ~esistant nails shall be installed per manufa~efs ~ ~n~~1 U,,). L . <br />Ootions <br />Hurricane nails the deck to the rafters to meet current SBCCI code. · <br /> <br />Install _varies on buildings _ feet of <br /> <br />aluminum ridge vent. · <br />\., <br /> <br />: ..~ <br /> <br />.See Pricing Section <br /> <br />Server Gf My Documents! Sales Team and Production Contracts! Shingle Reroof <br />
The URL can be used to link to this page
Your browser does not support the video tag.