Laserfiche WebLink
<br />[" <br />\. '~ <br /> <br />SPEC. DESCRIPTION OF WORK LOCATION COST <br />11 CARPENTRY - GENERAL SPECIFICATIONS <br /> At removed door opening, & alc unit install new wood <br /> studs to close up opening. Finish with gypsum wallboard taped <br /> and painted. Each side to match existing wall materials, Kit/Exterior <br />14 FLOOR REPAIR <br /> After al~als of existing flooring, repair floor . Kitchen <br /> with ne '. . lywood sub-floor suitable f~tion Bath # 1 <br /> of finished flooring. <;?j'l' ll\,\ '.'1 r\I\~ rV\ Li ving <br />21 FLOOR COVERING / SHEET-VINYL <br /> Remove existing flooring and install new sheet vinyl Bath # 1 <br /> over properly prepared subflooring, Kitchen <br />24 BASE & SHOE MOLDING <br /> Where shoe molding is removed to install new vinyl Newly <br /> flooring, replace all removed molding with new. vinyled areas <br />28 ROOF SHEA THING <br /> Replace any rotted sheathing and/or sheathing inadequate Exterior <br /> for nailing roof covering materials. <br />30 ATTIC VENTILATION <br /> Furnish and install ridge vents at all peaks, Exterior <br /> ~ <br /> ,;.: '2 '2.."E'->f <br /> n~t~' r-;-:,\ I ----. . <br />33 L, -- ,,' OEPT APFi'''VED ftL<f:? #~(S .,. <br />\"INDO'V REPAIR <br /> Rework/repair to proper operating condition, the existing Li vingID ining <br /> windows indicated. Replace all broken or worn parts. Kitchen <br /> Regalze window with obscure glass. Bath # 1 <br /> <br />PAGE TOTAL <br /> <br />NAME: Gerhardt <br /> <br />DATE: 10/06/04 <br /> <br />PAGE: 2 <br />