My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-3970
Zephyrhills
>
Building Department
>
Permits
>
2005
>
05-3970
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:45:53 PM
Creation date
2/21/2007 10:04:57 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
05-3970
Building Department - Name
HUDSON,JANET
Address
5639 20TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />o <br /> <br />SO <br />Ru <br />wh <br />arE <br />wh <br /> <br />co, <br />US( <br />ani <br />cal <br />qUI <br /> <br />BEFORE YOU BEGIN.... <br /> <br />A2 <br /> <br />Owner's Manual <br /> <br />" <br /> <br />Before beginning construction, check local building codes regarding footings, locati <br />and other requirements. Study and understand this owner1s manual. <br />Important information and helpful tips will make your construction easier and me <br />enjoyable. <br /> <br />Assembly Instructions: Instructions are supplied in this manual and contain <br />appropriate information for your building model. Review all instructions before you beg <br />and during assembly, follow the step sequence carefully for correct results. <br /> <br />Foundation and Anchoring: Your storage building must be anchored to prevent wil <br />damage. A foundation is also necessary as a base in order to construct a square and le\ <br />building. Anchoring and foundation materials are not included with' your building. V <br />recommend the combined use of an Arrow Floor Foundation Kit and an Arrc <br />Anchoring Kit as an effective method of securing your building to the ground (Availat <br />by mail order or at your local dealer) or you may construct the foundation and anchoril <br />system of your choice. Your assembly instructions provide information on a few methot <br />commonly used to secure and level a storage building. <br /> <br />Parts and Parts List: Check to be sure that you have all the necessary parts for yo <br />building. <br /> <br />-All part numbers can be found on the parts. All of these numbers (before the -) mu_st agree with t <br />numbers on the parts list. The parts list is located on page 12. <br /> <br />-If you find that a part is missing, include the model number of your building and contact: <br />Arrow Group Industries, Inc. Customer Service Departmen <br />Route 50 East Breese, Illinois 62230 <br />1-800-851-1 085 <br /> <br />-Separate contents of the carton by the part number while reviewing parts list. The first few ste~ <br />show how to join related parts to make larger sub assemblies which will be used later. <br /> <br />2 <br /> <br />-Familiarize yourself with the hardware and fasteners for easier use during construction. These a <br />packaged within the carton. Note that extra fasteners have been supplied for your convenience, <br />
The URL can be used to link to this page
Your browser does not support the video tag.