My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-4540
Zephyrhills
>
Building Department
>
Permits
>
2005
>
05-4540
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:43:13 PM
Creation date
3/20/2007 3:26:55 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
05-4540
Building Department - Name
O'KANE,EUGENE
Address
6141 ZEPHYR RIDGE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />New co...tr....ction, Re-roofing & Repairs <br /> <br />PROPOSAL <br /> <br />YORK ROOFING INC. <br />Repairs and Re-Roofing Specialist <br />5103 Vinson Dr. · Tampa, Florida <br />(813) 767-4133 <br />Lic# CC057858 <br />Insured & Bonded <br />SUBMITTED TO <br />To <br /> <br />.. , <br /> <br /> <br />DATE <br /> <br /> <br />r <br /> <br /> <br />STREET <br /> <br />l <br /> <br />--J.t ~ [L.lL I <br />We h e subm' specification~ and estimates for: <br />1 .----..iL Tear off old roof 'L layers <br />2.-L Replace all rotten lumber at additional cost of $2.50 per sq. ft. $40.00 per full sheet <br />I of 7/16 inch plywood <br />3.~ Dry in roof with ~ply ~Ib. felt <br />4.-L Replace all lead boots: Size:~, _,_ <br />5,~ Replace 4 in.vent(s) q. 10 in, vent(s) <br />6.~ Replace ~ Eave metal: Color 'v/,..7-L-- <br />7. j Replace valley metal <br />8.~lnstall Type Class A fiberglass fungus resistant shingles by Color <br />9.~ Shingles will be 6 nailed to meet Florida Codes for wind & Rakes cemented <br />10,_Cut hole and install _ft. vent(s) ridge: 4-foot off ridge vent(s) <br />11._Built up roofing & flat roofing <br />12._Dry in with 43 Ib, base sheet <br />13._lnstall a modified Bitumen cap sheet using a modified adhesive <br />14, , Replace _ Eave metal: Color <br />15,--'- Coat deck with aluminum roof coating <br />16.~Clean up and haul away all trash <br />17.-#-PulI magnet around job to pick up any loose nails or staples <br />18.-LDump fee and permit included in price . <br />19. 1 year workmanship warranty from date of completion <br /> <br />~S cI'..~~M 00 <br />. yr. 3-tab ~ <br /> <br />FAX <br /> <br />,l... <br /> <br />ONTACT PERSON <br /> <br />25 yr. DIM $ <br /> <br />We PI'opoM hereby to furnish material and labor n complete in accordance with above specifications, for the sum of: <br />dOllarj ( $ , ) plus any lumber charges. <br />Payment to be made as follows: tI t? (' 'I^. r', 0 ?r. f ,.t.! , '" <br />I <br /> <br />,. f' ' <br />Du~ing the course of the roofing work. the customer agrees to hold harmles~oofing <br />for any costs or damages resulting from asbestos materials in the roof system Including <br />but not limited to all costs of Ittigation and attorney tees. <br /> <br />Customer agrees to provide adequate roof access for trucks. equipment, and perso~nel. <br />Customer also agrees to furnish electricity if needed to complete the job. ~ y, K <br />Roofing is not responsible for any cracked or damaged driveways or sidewalks. <br /> <br />Any final bill not paid upon completion of job will be subject to an , B% (eighteen percent) <br />APR on unpaid balance compounded dally. All materials guaranteed to as specnled. <br />All work to be completed in a workman like manner according to standard practices. <br />Any allerations or deviation from above specnlcatlons involving costs, will be executed only <br />upon written orders, and will become an extra charge over and above the proposal. <br />All agreements are contingent upon strikes, accidents or delays beyond our contract. <br />Owner to carry fire, tornado. and other necessary insurance's. Our workers are <br />fully covered by workman's compensation and liability insurance. <br /> <br />Attorney fee and costs; In connection with any litigation arising out of this contract. the <br />prevailing party shall be entitled to recover all costs. including reasonable attorney fees. <br /> <br />The proposal is subject to acceptance within <br />at the option of the ~ig~ed, j <br /> <br />Authorized Signature ~ ~ <br /> <br />days and is void thereafter <br /> <br />t:J "i <br />I rv-)J! <br /> <br />AcceptAttce ofProro-Al - The above prices, specifications and payment <br />are satisfactory and are hereby accepted. You are authorized to do the wDrk <br />as specified, Payment will be made as outlined above. By accepting this proposal <br />it becomes our contract. <br /> <br />Signature <br /> <br /> <br />Date of Acceptance <br /> <br />Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.