My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-4790
Zephyrhills
>
Building Department
>
Permits
>
2005
>
05-4790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:42:06 PM
Creation date
3/28/2007 3:42:05 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
05-4790
Building Department - Name
GHANI,ABDUL
Address
5821 GALL BV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2Q05 07/15 FRI 09:~1 FAX <br /> <br />I4J 007/007 <br /> <br />c..' c>>-.. *" <br /> <br />PROPOSAL I CONTRACT AGREEMENT <br /> <br />cas CONSTRUCfION <br />30518 Scott St <br />San Antonio Fl. 33576 <br />352-588-2095 <br />813-477-7801 <br /> <br />June 15,2005 <br /> <br />MIDTOWN ~{NIC <br />Abdul Ghana, M.D <br />Gloria <br />5821 Gall Blvd. <br />Z-Hills Fl. 33541 <br />813~ 788-5524 <br /> <br />}, CRS CONSTRUCTION hereby proposes to furnish all.mat.eria1s and perform all <br />labor necessary for the improvements at the above address. Work will be done to <br />general construction specifications and meet local building codes. All work to be <br />done is listed below in work order <br />2, All material and labor will be warranted to be of good quality, fTee from faults <br />and defect for a period of one year from. the date of completion. The work will be <br />performed and completed in a substantial and workman like manner for the sum <br />of three- thousand two hundred dollars and no cents ($3,200.00). Payment <br />schedule will be as follow~, 50% will be to start project and the remaining will <br />due at substantial completion. <br /> <br />WORK ORDER <br />1. Remove all water damaged, rotted T -1-11 wood on gable ends. <br />2. Remove all rotted trim on gable ends. <br />3. Replace with new T -1-11 wood and trim <br />4. Paint and caulk any exposed wood or trim (pain to match existing) <br />5. Pain and existing T -1-11 that is exposed to the weather (roofing co. installed) <br />6. Other work. not mentioned in work order <br /> <br />Contractor <br /> <br /> <br />~~..s- <br />
The URL can be used to link to this page
Your browser does not support the video tag.