Laserfiche WebLink
<br />PROPOSAL I CONTRACT AGREEMENT <br /> <br />Jackie LeMaster <br />(813)917-1148 <br /> <br />June 15, 2005 <br /> <br />MIDTOWN CLINIC <br />Abdul Ghana, M,D <br />Gloria <br />5821 Gall Blvd, <br />Z-Hills Fl. 33541 <br />813-788-5524 <br /> <br />1, Jackie LeMaster hereby proposes to furnish all materials and perform all labor <br />necessary for the improvements at the above address, Work will be done to <br />general construction specifications and meet local building codes, All work to be <br />done is listed below in work order <br />2, All material and labor will be warranted to be of good quality, free from faults <br />and defect for a period of one year from the date of completion, The work will be <br />performed and completed in a substantial and workman like manner for the sum <br />of three- thousand two hundred dollars and no cents ($3,200,00), Payment <br />schedule will be as follows, 50% will be to start project and the remaining will <br />due at substantial completion, <br /> <br />WORK ORDER <br />1, Remove all water damaged, rotted T -1-11 wood on gable ends, <br />2, Remove all rotted trim on gable ends, <br />3, Replace with new T -1-11 wood and trim <br />4, Paint and caulk any exposed wood or trim (pain to match existing) <br />5. Pain and existing T-1-I1 that is exposed to the ~.r (.ro.OI fin~ eo. installed) <br />6. Other work not mentioned in work order . ~~ <br /> <br />Contractor ~ ~~ Owner?,? y~ 7-017-05 <br /> <br />/ <br />