Laserfiche WebLink
<br />Ii <br /> <br />Proposal <br /> <br />Date June 14, 2005 <br /> <br />.. <br /> <br />John L. Smith Construction, Inc. <br />4240 Coats Rd. <br />Zephyrhills, Fl. 33541 <br />(813) 782-0470 <br /> <br />CBC 059519 <br /> <br />Proposal Submitted To <br /> <br />Work To Be Performed At <br /> <br />Name Nye, McAlvanah and Henson <br />Street 5360 Fox Hunt Drive <br />City Wesley Chapel, FL 33543 <br />Telephone # 973-2121 <br /> <br />Street 38112 15th Ave <br />City Zephyrhills, FL <br />Date of Plans <br />Architect Darrell Howard <br /> <br />We hereby propose to furnish all materials and labor for the completion of Tampa Tribune Building to specs of <br />plans and attached spec sheets. <br />All material is guaranteed to be as specifiecL and the above work to be completed in accordance with the <br />drawings and specs submitted for ab0ve work. All work and materials to meet local industry standards and <br />existing codes in effect at date of this proposal. The above work to be performed for the sum of <br />Eighty nine thousand, nine hundred seventy five and 00/100 Dollars ($ 89,975.00 ) <br />with payments to be made as follows: To be agreed upon at acceptance of this proposal. <br /> <br />Any alterations or deviations from the above specifications involving extra costs, will be executed only upon <br />written orders, and will become an extra charge over and above the estimate. All agreements contingent upon <br />strikes, accidents or delays beyond 01lll" control. Owner to cany fire, wind and all other necessary insurance <br />required upon above work. Workers Compensation and Public Liability Insurance to be taken out by builder. <br /> <br />Cost of collection and attorney's fees in the event of any default by the Owner and in the event that the Builder <br />must initiate any collection proceedings or must engage attorneys for any purpose whatsoever relating to this <br />agreement, including but not limited to seeking the enforcement of its terms and conditions, the Owner <br />acknowledges, agrees, confirms and Warrants, that they are responsible for all costs and attorney's fees incurred <br />by the Builder. <br /> <br />Respectfully submitted~- /' --;.r/ _----~--4) <br />Per John L. Smith CoJ'truction <br />This proposal may be withdrawn by us if not accepted within 15 days <br /> <br />Acceptance of Proposal <br />We, the undersigned have read this proposal and do agree to the terms and conditions as listed above and to any <br />attachments, if included. We authoriZe you to do the work as specified. Payment will be made as outlined in this <br /> <br />::~ /,77 ! OJ uJ f-/ <br />