My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-5096
Zephyrhills
>
Building Department
>
Permits
>
2005
>
05-5096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:40:48 PM
Creation date
4/17/2007 3:41:20 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
05-5096
Building Department - Name
FAIRLEY,MERLE
Address
6044/6048 9TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SCJ{)f.ff.(j{ Roofing, Inc. <br /> <br />Shingle Re-roof continued. . . <br /> <br /> <br />Commitment t" <br /> <br /> <br />-All work shall be carefully superviserl and completed by workmen skilled and knowledgeable in methods needed to <br />produce high quality work. <br />-The joh ~ite ~hal1 he kept clean daily r the duration of the joh and the grounds shaH he left clean of all roof related <br />debris after completion. <br />-The yard shall be swept with a magne . <br />-The contractor shall provide permit, .. _tkman compep..satiorl, a..nd generalliability Ln..sura..nce. <br />-Carpentry, authorized change orders" d work, which are not covered u,'1der t.~e scope of work outlined herein, shall be <br />perfonned on a time and material basis utl1ess otherwise agreed upon. <br /> <br />l\~~UFAC llJRER& CONTRACTOR 'VARRAt~TY (S) <br />Upon completion of the work and pa. ent of all monies owed, Contractor shall issue: <br /> <br />1. A '-- ~ year warranty for wo knla.'1Ship limited to leaks caused by any ,component installed by the contractor, <br /> <br />') <br />"-. <br /> <br />Shingle manufacturer shall provid lit <br /> <br />~~o <br /> <br />year limited warranty. <br /> <br />CONTRACf PRICING <br /> <br />1 ~isi1ble 1l ~1v1 i\llovv3U1ce------------ -._______________________________________________________ <br />I <br />I Shingle Re-roof as described herein- -..-----------__________________________________________ <br />I Moilifications <br />I <br />I <br />I TOTAL AGREED UPON CONTRACT <br />I <br />I TERMS <br />I <br />I <br />I <br /> <br />,JS "'/0 <br /> <br /> <br />I <br />$1 <br />I <br />$1 <br />- I <br />$1 <br />$1 <br /> <br />R1ICE, LABOR AND MA TERIAL------------------- $1 LJ- 9 J ~ <br /> <br />ISo-I a" ( 'I' U Vb lJ C c ... pI e 1;,,':' <br /> <br />400 .0'0 <br />'-Is I "3. SO <br /> <br />I <br />I <br />I <br />1 <br />I <br />I <br />I <br />I <br /> <br />I <br />50 I <br />~ / <br />1 <br />I <br />I <br />I <br />I <br />I <br />---..-J <br /> <br />Price Valid For Thirty (30) Days <br /> <br />Collection costs if any, together wit.~ u.,terest shall be added to the contract price if payment default occurs. <br />C3U1cellation of the contract after e 2-hour grace period shall incur a nominai fee. <br /> <br /> <br />~ <br /> <br /> <br />Date }e;, ....di ~ O~ <br /> <br />I <br />I accept the above price and terms; }tpu are authorized to begin work. <br />Signed i , .~ ~ <br /> <br />Signed ~~ <br /> <br /> <br />1 "'I Q r-"- <br />Date . C9 - v.. 1- 0 ':J <br /> <br />[3part] SillNGLE RE-ROOF CFI.doc <br /> <br />Page 20f2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.