My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-5167
Zephyrhills
>
Building Department
>
Permits
>
2005
>
05-5167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:40:29 PM
Creation date
5/1/2007 2:26:13 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
05-5167
Building Department - Name
RAMAPPA MEDCIAL
Address
GREEN SLOPE & LAUREL HAMMOCK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />, Permit No.: 44009944.008 <br /> <br />Page 3 <br /> <br />February 22, 2005 <br /> <br />2. Unless specified otherwise herein, two copies of all information and reports required by this permit <br />shall be submitted to: <br /> <br />Brooksville Regulation Department <br />Southwest Florida Water Management District <br />2379 Broad Street <br />Brooksville, FL 34604-6899 <br /> <br />The permit number, title of report or information and event (for recurring report or information <br />submittal) shall be identified on all information and reports submitted. <br /> <br />3. The Permittee shall retain the design engineer, or other professional engineer registered in <br />Florida, to conduct on-site observations of construction and assist with the as-built certification <br />requirements of this project. The Permittee shall inform the District in writing of the name, address <br />and phone number of the professional engineer so employed. This information shall be submitted <br />prior to construction. <br /> <br />4. Within 30 days after completion of construction of the permitted activity, the Permittee shall submit <br />to the Brooksville Service Office a written statement of completion and certification by a registered <br />professional engineer or other appropriate indMdual as authorized by law, utilizing the required <br />Statement of Completion and Request for Transfer to Operation Entity form identified in Chapter <br />4OD-1.659, F.A.C., and signed, dated and sealed as-built drawings. The as-built drawings shall <br />identify any deviations from the approved construction drawings. <br /> <br />5. The District reserves the right, upon prior notice to the Permittee, to conduct on-site research to <br />assess the pollutant removal efficiency.of the surface water management system. The Permittee <br />may be required to cooperate in this regard by allowing on-site access by District representatives, <br />by allowing the installation and operation of testing and monitoring equipment, and by allowing <br />other assistance measures as needed on site. <br /> <br />6. This modification, Construction Permit No. 44009944.008, amends the previously issued <br />Construction Permit No. 44009944.007, and all conditions are replaced by the conditions herein. <br /> <br />7. If limestone bedrock is encountered during construction of the surface water management <br />system, the District must be notified and construction in the affected area shall cease. <br /> <br />8. The Permittee shall notify the District of any sinkhole development in the surface water <br />management system within 48 hours of discovery and must submit a detailed sinkhole evaluation <br />and repair plan for approval by the District within 30 days of discovery. <br /> <br />9. The District, upon prior notice to the Permittee, may conduct on-site inspections to assess the <br />effectiveness of the erosion control barriers and other measures employed to prevent violations of <br />state water qual;w standards and avoid downstream impacts. Such barriers or other measures <br />should control discharges, erosion, and sediment transport during construction and thereafter. <br />The District will also determine any potential environmental problems that may develop as a result <br />of leaving or removing the barriers and other measures during construction or after construction of <br />the project has been completed. The Permittee must provide any remedial measures that are <br />needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.