My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-5276
Zephyrhills
>
Building Department
>
Permits
>
2005
>
05-5276
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 3:39:55 PM
Creation date
5/2/2007 2:16:00 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
05-5276
Building Department - Name
DRAGAN,ROBERT
Address
38026 MEDICAL CENTER DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SCHflCN,CR.., Roofing, Inc. <br /> <br />8949 Gall Boulevard, Zephyrhills, Fl 33541 <br />PH: {813} 782..0920 & (352) 567-8580 Fax: (813) 715-4875 <br />STATE CERTIfIED BUILDING AND ROOFING CONTRACTOR #CB-C059BI7 and ICC:-C05BI34 <br />SERVING FLORIDA'S FINEST HOMES & BUSINESSES SINCE 1976 www.schapereonstruetion.com <br /> <br />Name Rehab Point me. <br /> <br />Date <br /> <br />12/13/2005 <br /> <br />Address 38026 !vledical Center Ave. <br /> <br />Phone <br /> <br />813-779-8829 <br /> <br />Robert Dragan <br />City Zeph)Thills <br />Parcel # <br /> <br />AU Phone <br /> <br />Fax 813-779-8827 <br /> <br />Zip 33540 <br /> <br />State FL <br /> <br />\\1 e hereby propose to furnish materials and labor necessary for the completion of: <br /> <br />DURO-LAST Roofulg System I)roposal <br /> <br />1. Barricade off work area as needed. <br />2. Remove loose debris from flat roof <br />3. Remove existing flashings and boots as required. <br />4. Check substrate decking for water damage. Replacement of decking will be done on a time and material <br />basis at the rate of 38.50 dollars per man-hour plus materials marked up a 30 % contractor's <br />fee. <br />5. Install insulation, mechanically attached per manufacturers specification. <br />6. lnstall VURO-LA,ST membrane. <br />7. Disconnect and reconnect AJe units as required. <br />Note: Schaper Roofing cannot be responsible for the existing condition of the wiring, freon lines, <br />ductwork, electrical or the A/e units. due to the a;;e C?lthe units. <br />8. Install new DURO-LAST boots, custom curb and comers as required. <br />9. Install two-way vents as required. <br />10. Install tenn bar as required. <br /> <br />Schaper RoomS!. Commitment to Quality <br /> <br />· All work shall be carefully supervised and completed by workmen skilled and knowledgeable in methods needed <br />to produce high quality work. <br />· . The job site shall be kept clean daily for the duration of the job and the grounds shall be left clean of all roof <br />related debris after completion. <br />· The yard shall be swept with a magnet. <br />· The contractor shaH provide permit, workman compensation, and general liability insurance. <br />o Carpentry, auth.orized change orders and work, which are not covered under the scope of work outlined herem, <br />shall be performed on a time and material basis unless otherwise agreed upon. <br /> <br />~ <br /> <br />Rehab P(lint Du'RO 121305.doc <br /> <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.