<br />
<br />
<br />PROTECT ALL EDGES
<br />~ITH RUBBER PADS
<br />
<br />
<br />
<br />'H'
<br />
<br />'L'
<br />
<br />SEE DETAIL 'A-A'
<br />
<br />
<br />112,OO~
<br />
<br />'1.0.' ~I
<br />'0,0.'-1
<br />
<br />NoTESI
<br />
<br />
<br />CABLES AND SHACKLES ARE
<br />TO BE PROVIDED BY OTHERS
<br />
<br />1. 'w'ARNINGI THIS SHELTER MUST BE UNLOADED LEVEL DUE TO HEAVY
<br />EQUIPMENT STAGED INSIDE THE BUILDING, OPEN THE DOOR TO DETERMINE
<br />THE EXACT LOCATION OF THE STAGED EQUIPMENT, EXERCISE CAUTION TO
<br />ENSURE THE PROPER UNLOADING OF THIS SHEL TER. ,IF FOR ANY REASON
<br />DURING LIFTING THE SHELTER SHo\.lS TILTING TENDENCIES, BALANCE THE
<br />SHEL TER APPROPRIATELY,
<br />2, BUILDING \.IEIGHTI (SEE TABLE SHEET 2) \.110 CUSTOMER'S EQUIPMENT,
<br />3. 150' MINIMUM SPREADER BAR MUST BE USED TO AVDID BUILDING DAMAGE,
<br />4, USE APPROPRIATELY SIZED SHACKLES TO CONNECT LIFTING CABLE OR
<br />CHAINS TO SHELTER LIFTING LUGS,
<br />5, IF THE SHELTER OFF LOADING IS THE RESPONSIBILITY OF OTHERS IT
<br />SHOULD BE ACCOMPLISHED BY TRAINED AND EXPERIENCED PERSONNEL,
<br />6. THIS IS ONLY A RECOMMENDATION, IT IS THE RESPONSIBILITY OF THE
<br />CONTRACTOR TO DETERMINE THE SIZE OF ALL LIFTING HARD'w'ARE AND
<br />EQUIPMENT USED TO HANDLE AND SET THE SHELTER,
<br />7, CUSTOMER TO REMOVE CARDBOARD FROM HVAC UNITS AND ADJUST
<br />THERMOSTAT 'LEVEL' UPON START UP,
<br />
<br />
<br />...... Listing Agency Approval
<br />~ PYRAMID1, INC.
<br />
<br />These details have been reviewed
<br />for conformance with the Florida
<br />Manufactured Building Act of 1979
<br />and adhere to the following criteria,
<br />
<br />Construction Type VB
<br />Occupancy Classlfication~
<br />Allowable # of Floors 1
<br />Wind Velocity' 130 mO.h,
<br />Fire Rating (exl.walls) 0 , 2 hr.
<br />Floor Load 225 os.f.
<br />Date of ReView October 14 2005
<br />Manufacturoc Precision Quine,", CorP .
<br />High VelOCity Hurricane Zone .l&...-
<br />
<br />
<br />(()-1~
<br />
<br />SHELTER DIMENSION TABLE
<br />SHEL TER SIZE MODEL 'W '0,0.' 'I,D/ 'V
<br />NUMBER HEIGn~ BASE BASE BASE
<br /> XPNI2209/NR 124,50 140.63 136,11 243,25
<br />12' )( 20' XPN12209/lfR 128.75 140,63 136,11 243,23
<br />XPN12209/2rR 128,73 140,63 136,11 243,25
<br /> XPNI2209/2fR/UNI 129,75 140.63 136,11 243,25
<br /> XPNI0209/NR 124,50 122,63 118,11 243,25
<br />10' )( 20' XPNI0209/lfR 128,75 122,63 118,11 243,23
<br />XPNI0209/2fR 128.73 122,63 118,11 243.25
<br /> XPN1~09/2fR/UNI 128,75 122,63 118,11 243,25
<br />
<br />DETAIL "A-A'
<br />
<br />(fd
<br />
<br />PRECISION QUINCY CORP.
<br />1525 IJ, LAKE SHORE DR., IJOODSTDCK, IL 50098
<br />PHONE' 815 338-2675, FAX' 815 338-2960
<br />
<br />CUSTOMER'
<br />
<br />E SEE SHEET 2
<br />D UPDATED
<br />C UPDATED DIMENSIONS
<br />B UPDATED
<br />REV. DESCRIPTION
<br />ACAO #IXPN60000E PLOT SCALE' 1=96 REQ,BY,
<br />
<br />JPH OS/24/04
<br />AC 10/24/03 ASSEMBL Y,
<br />AC 09/30/03
<br />JPH 03/27/03 TITLE' L I F TIN G ~
<br />BY CHK BY ti'PV BY DATE BY' SCALE'
<br />APPV BY' DATE' 01/17/03 JPH 1/8"==1"
<br />
<br />STANDARD
<br />XP SERIES
<br />FOUNDATION RECOMMENDATIONS
<br />
<br />ORDER #1 DIJG #,
<br />STD XP-N-60-00-0
<br />
<br />REQ,BY,
<br />CHK BY,
<br />
<br />SHEET
<br />10f'2
<br />
|