My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-5529
Zephyrhills
>
Building Department
>
Permits
>
2006
>
06-5529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:21:28 PM
Creation date
5/10/2007 8:31:12 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
06-5529
Building Department - Name
MARSH,MORRIS
Address
7152 ASHLAND DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2 SEnlNG AND FASTENING THE WINDOW <br /> <br />A. Install sill spacer. Place a continuous 1/4" thick spacer at the bottom of the <br />window opening. The spacer should be cut 1/2" shorter than the width of the <br />rough opening and be centered between the sides of the rough opening. <br />DO NOT shim between the bottom of the window and the bottom of the <br />rough opening. <br />Note: 10 determine the width of the spacer, measure the distance from <br />the back of the J1n to the interior frame edge and cut the spacer to this <br />dlmension. Place the <<We of the spacer Bush with the exterior of the <br />buDding. Improper placement of shJms may result in bowing the bottom <br />of the window. <br /> <br /> <br />B. Remove plastic wrap and cardboard packaging from window. DO NOT open the window <br />until it is fully fastened. Inspect the unit for any crack or penetration in the frame. DO NOT <br />install damaged units. <br /> <br /> <br />2 OR MORE PEOPLE WILL BE REQUIRED FOR THE FOLLOWING STEPS. <br /> <br />C. Insert the window from the exterior of the building. Place the bottom <br />of the window on the spacer at the bottom of the opening, then tilt the <br />top into position. Center the window between the sides of the opening to <br />allow clearance for shimming, and insert one roofing nail in the first hole <br />from the corner on each end of the top nailing fin. These are used to hold <br />the window in place while shimming it plumb and square. <br />Note: DO NOT drive the naJl all the way in. <br /> <br />D. Plumb and square window. Place shims 1" from the <br />bottom and top of the window between the window <br />and the sides of the opening. Adjust the shims as required <br />to plumb and square the window in the opening. <br />Casement and Fixed: If the frame height exceeds 4 7" , <br />place shims at the midpoint of the window sides. <br />Double and Single-hung: Be sure to shim at the <br />checkrail. If the frame height exceeds 47", place <br />additional shims midway between the checkrail shims <br />and both the top and bottom shims. <br /> <br />Interior View <br /> <br />E. Fasten the window to opening by driving 2" galvanized roofing nails into <br />every other pre-punched hole in the nailing fin. Drive nails until the head <br />contacts the fin, however do not sink the head. This allows for movement <br />of building materials. <br />DP 50: Insert #8 x 2" pan head stainless steel wood screws with flat washers <br />into every pre-punched hole in the nailing fm. Drive screws until the <br />head/washer contacts the fin, however do not sink the washer. This allows for <br />movement of building material. <br /> <br />E Check window operation (vent units only). Open and close the window a few <br />times to check for proper operation. Close and lock the window. I <br />Double and Single-hung: Make sure the window will tilt correctly. : <br />Note: If there are any problems with the operation of the window, recheck shlm ~_ <br />locations and acflust for plumb and square. <br /> <br />-- <br />-- <br />-- <br /> <br />-- <br />-- <br /> <br />-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.