My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-5632
Zephyrhills
>
Building Department
>
Permits
>
2006
>
06-5632
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2009 4:20:45 PM
Creation date
5/29/2007 9:17:04 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
06-5632
Building Department - Name
BOOTH,TERESA
Address
37649 NEUKOM AV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SClf)f.(pEC}{ Roofing, Inc. <br /> <br />8949 Gall Boulevard, Zephyrhills, FI 33541 <br />PH: (813) 782-0920 & (352) 567-8580 Fax: (813) 715-4875 <br />STATE CERTIfIED BUILDING AND ROOfING CONTRACTOR #CB-C059BI 7 and #CC-C05BI34 <br />SERVING FLORIDA'S FINEST HOMES & BUSINESSES SINCE 1976 www.schaperconstruction.com <br /> <br />Date: 3/27/2006 <br /> <br />Phone: 813-779-2746 <br /> <br />Fax: <br /> <br />Name: Bill & Theresa Booth <br /> <br />Contact: <br /> <br />Address: 37649 Neukom Ave. <br /> <br />Grand Horizons <br /> <br />City Zeph}Thills <br /> <br />State FL <br /> <br />Zip 33541 <br /> <br />Parcel # <br /> <br />\lIe hereby propose to f..L.T..ish materials a.."ld labor necessary for the completion of: <br /> <br />Shingle Re-roof <br /> <br />1 <br />~. <br /> <br />For the shingled portions of the home, remove old roofmg materials to dry-in, taking precautions to <br />protect the building and the landscaping. Groom the deck and reset the existing decking nails. <br /> <br />2. Replace bad wood other than herein agreed to at <br />materials marked up at a 30 <br /> <br />38.50 dollars per man-hour plus <br />percent contractor's tee. <br /> <br />3. Install <br /> <br />white <br /> <br />eaves drip with all edges sealed with plastic cement. <br /> <br />4. Install <br /> <br />two <br /> <br />layer(s) of ASTM 15-lb asphalt shingle underlayment. <br /> <br />5. Install galva...uzed valley metal for the length of all valleys. Valleys will be closed <br /> <br />6. Install new lead boots over vent pipes and replace metal vents with new. <br /> <br />7. Chalk lines shall be struck to assure proper shingle exposure. <br /> <br />8. Install 30 Year 3-tab Class, a self-sealing fungus resistant fiberglass shi.."lgle. <br />Manufacturer: Certainteed Color: ~\)t.V' L {11; n ~ <br /> <br />9. Six 1-114" corrosion resistant nails shall be installed per manufacturers instructions. <br /> <br />Options <br /> <br />Hurricane-nail the deck to the rafters to meet current SBCCI code. * <br /> <br />Install <br /> <br />nla <br /> <br />feet of <br /> <br />aluminum ridge vent. * <br /> <br />Replace two skylights. <br /> <br />"'See Pricing Section <br /> <br />J <br /> <br />Booth30 032706 <br /> <br />Page 10f2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.