Laserfiche WebLink
<br />CClsi,tes™ : Crown Castle Online Application Page 2 of3 <br />6 5T-4 L 194ft 240 EMS WIRELESS 1 1930.2 1944.8 1850.2 1864.8 TX/RX Mid-Mount Proposed <br /> RR65-19-02DP <br />Feedline Information <br /># Fig, Pos, Qty Mfg. Model Length Status <br />1 5T-4 A 2 Primary: EUPEN EC7-50 244 ft Proposed <br /> Secondary: N/A <br />2 5T-4 D 2 Primary: EUPEN EC7-50 244 ft Proposed <br /> Secondary: N/A <br />3 5T-4 E 2 Primary: EUPEN EC7-50 244 ft Proposed <br /> Secondary: N/A <br />4 5T-4 H 2 Primary: EUPEN EC7-50 244 ft Proposed <br /> Secondary: N/A <br />5 5T-4 2 Primary: EUPEN EC7-50 244 ft Proposed <br /> Secondary: N/A <br />6 ST-4 L 2 Primary: EUPEN EC7-50 244 ft Proposed <br /> Secondary: N/A <br /> <br />Optional Component Information <br /> <br /># Fig. <br />1 5T -4 <br />2 5T-4 <br />3 5T -4 <br />4 5T -4 <br />5 5T -4 <br />6 5T -4 <br /> <br />Pos, Mfg. <br />A LGP TELECOM <br />D LGP TELECOM <br />E LGP TELECOM <br />H LGP TELECOM <br />I LGP TELECOM <br />L LGP TELECOM <br /> <br />Model <br />LGP1390B <br />LGP1390B <br />LGP1390B <br />LGP1390B <br />LGP1390B <br />LGP1390B <br /> <br />Tower Mounted Amplifier <br />Elev, 1 Statusl <br />190ft Proposed <br />190ft Proposed <br />190ft Proposed <br />190ft Proposed <br />190ft Proposed <br />190ft Proposed <br /> <br />Elev.2 <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br /> <br />Status2 <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br /> <br />Building/Pad/Power Requirements <br />Type L W H Power Requirements <br />Building Requirements VAC 240 Phase Single <br />New Building/Shelter Cabinet N/A N/A N/A Phase <br />Existing Building/Shelter Floor Space N/A N/A N/A Amps 200 <br />Building Identification 0 Generator Needed? Yes Generator 15kW <br /> Size (kW) <br />Pad Requirements Generator Fuel Generator GENERAC <br />Required Leased Size 15ft 23ft 10ft Type Propane Manufacturer POWER <br /> SYSTEMS <br />Pad Size 17ft 7ft Generator Fuel 4675FM- <br /> 20gal Generator <br />Number of Equipment Cabinets at time of Install 1 Tank Size Model 1 <br /> Battery Requirements <br /> Quantity 0 <br /> Manufacturer N/A Model N/A <br /> <br />Comments/ Additional Information <br /> <br />Comments: <br />New configuration of (6) EMS RR65-19-02DP (12) Eupen 1 5/8" coax, and (6) TMA's. Company's full name is T-Mobile South LLC, a <br />Delaware limited liability company. <br /> <br />* *Indicates where Cut Sheet data has been entered. <br /> <br />NOTICE: Structural Analysis shall be performed in accordance with the current revision of the TIA/EIA 222 <br />standard and applicable local building permit codes and standards. EME analysis shall be consistent with current <br />revision of FCC/OSHA standard OETB 65. AM detuning, when required, will be performed to 47 CFR22,371. The <br />customer is responsible for all analysis expenses. <br /> <br />All construction drawings are subject to Crown Castle engineering approval prior to commencement of tower <br />attachments and compound installations. Installation of equipment not conforming to approved drawings may <br />violate the terms of the occupancy agreement and will be correded at the customer's expense. Crown Castle <br />International requires drawings for pre-construction approval and as built drawings for physical configuration <br />validation to be submitted as unlocked AutoCAD files (Version 2000i preferred). <br /> <br />Appendix PI. - Antenna, Feedline, TMA Specifications <br />