Laserfiche WebLink
<br />THERMOPLASTIC ROOF SYSTEM SPECIFICATIONS <br /> <br />1. Tropical Roofing will prepare the existing roof system, inspect and groom the wood <br />deck to prepare for the installation of the new roof assembly. <br />2. A pressure treated wood nailer shall be installed around the perimeter of the home. It <br />shall be fastened with commercial grade corrosion resistant steel screws <br />approximately one fo.ot on center. <br />3. A one and one quarter inch foil faced expanded polystyrene insulation shall be <br />mechanically attached to the wood deck with commercial grade corrosion resistant <br />steel screws of sufficient length to penetrate the wood deck and using a three inch <br />insulation plate. <br />4. The thermoplastic membrane shall be rolled out over the roof surface and fastened <br />in a blind fastening method with the same screws and plates. At the roof edge the <br />membrane shall be wrapped over the existing edge detail, down the vertical surface <br />and terminated there with an aluminum termination bar and stainless steel screws <br />installed approximately six inches on center. <br />5. Tropical Roofing will install all exhaust and plumbing vents and all necessary <br />flashings, to comprise a complete roof system. <br />6. Tropical Roofing will remove all roofing related debris. <br />7. Tropical Roofing will warranty its work against leaks and workmanship for a period of <br />fifteen years. <br />8. Wood replacement is not included in the contract base price listed herein and shall <br />be performed on a time and material basis. Plywood shall be installed at the rate of <br />sixty dollars a sheet, lumber at the rate of five dollars and fifty cents a linear foot. <br />9. Any other repairs necessary as a result of unforeseen circumstances shall be <br />charged on a time and material basis at cost plus twenty fIVe percent and shall only <br />be performed with approval and a written change order. <br /> <br />GENERAL CONDITIONS <br /> <br />1. All materials are guaranteed to be as specified. All work is to be completed in a <br />workmanlike manner according to standard practices. <br />2. The Owner of the property agrees to carry fire, tomado and any other necessary <br />insurance to cover any other damage resulting from acts of God. <br />3. Tropical Roofing shall be fully covered with Workman's Compensation Insurance. <br />4. Tropical Roofing agrees to provide a Release of Lien covering any suppliers, sub- <br />contractors and prime contractors upon payment in full as described herein. <br />5. Tropical Roofing shan provide all material and labor to complete the Contract unless <br />otherwise agreed upon. <br />6. All work areas shall be cleaned and debris removed at the end of each workday. <br />7. Any repairs arising as the result of unforeseen circumstances shall be performed on <br />a time and material basis as detailed herein. Any additional work shall only be <br />performed by written approval from the Owner or their authorized representative. <br />S. Tropical Roofing shall provide all necessary permits, licenses, and certifications <br />associated with the performance of this Contract. These shall be made available <br />upon demand from the owner as necessary. <br />9. Tropical Roofing shall pay all payroll, unemployment and Social Security taxes, sales <br />tax and any and aU other taxes associated with the performance of this Contract. <br /> <br />END OF SECTION <br />