Laserfiche WebLink
<br />. <br /> <br />GEt€AAl ~TRUcrlOH HOlES <br /> <br />1. <br /> <br />AlL WORK PERFORMED SHALL COMPLY WI11~ TI-lE: REGUlATIONS AND ORDINANCES OF <br />Tl1E VARIOUS GOVERNMENTN.. AGENCIES HAVING JURISDICTION OVER THE WORK. <br /> <br />GRAOINO AND O~ NOlES <br /> <br />1. ALL DElETERIOUS SUBSTANCE MATERIAL. (I.E. MUCK. PEAT. BURIED DEBRIS). IS <br />TO BE EXCAVATED IN ACCOROANCE WITH THESE PLANS. OR NS. DIRECTED BY Tl1E <br />OWNER'S ENGINEER. OR OWNER'S SOIL TESTING COMPANY. DElETERIOUS MATERIAL <br />IS TO BE STOCKPILED OR REMOVED fROM THE Silt NS DIRECtED BY 111E OWNER. <br />EXCAVATED AREAS ARE TO BE BACKFillED wrm APPROVED MATERIALS N-lD <br />COMPACTED AS SHOWN ON THESE PLANS. <br />2. Tl1E CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTlNG EXCAVATIONS AGAINST <br />COUAPSE AND WILL PROVIDE BRACING. SHEErING, OR SHORING, AS NECESSAAY. <br />mENCHES SHAU- BE KEPT DRY WHILE PIPE AND APPURTENANCES ME 8EING <br />PLACED. DEWATERING SHALL BE USED f>S REQUIRED. <br />3. ALL STORM SEWER PIPE SHALL BE REINFORCED CONCRETE CLASS III (ASTM C-76) <br />UNLESS OTl1ERWISE NOTED ON PLANS. <br />4. PVC STORM PIPE, 12" AND SMALLER SHALL CONFORM 10 AWWA C-900, ClASS 150 <br />STANDARDS, UNLESS OTl1ERWISE NOTED. <br />5. ALL DRAINAGE STRUCTURE GRATES AND COVERS WITHIN TRAFfiC AREAS SHALL BE <br />ffiAFflC RATED fOR H-20 LOADINGS. <br />6. THE CONTRACTOR IS TO SOD THE RETENTION/DETENTION POND AS INDICATED ON <br />PLANS WITHIN ONE WEEK fOLLOWING CONSTRUCTION OF THE POND. <br />7. MATERIALS AND CONSTRUCTION' MElliODS FOR STREETS AND STORM DRAINAGE <br />CONSTRUCTION SHALL BE IN ACCORDANCE Wl11-i THE LOCAL REGULATORY AGENCY. <br /> <br />PAVING NOTES <br /> <br />1. PRIOR TO CONSTRUCTING CONCRETE PAVEMENT, THE CONTRACTOR IS TO SUBMIT A <br />PROPOSED JOINllNG PATIERN TO Tl1E OWNER'S ENGINEER fOR APPROVAL <br />2. Tl1E CONTRACTOR IS TO PROVIDE A 1/t' BITUMINOUS EXPANSION JOINT MATERIAL <br />wrm SEALER, AT ABUTMENT OF CONCRETE AND ANY STRUCTURE. <br />". ALL PAVEMENT MARKINGS SHAlL BE MADE WITH TIWTlC P^INT IN ACCORDANCe: <br />TO mor STAN(),A,RO SPECIFlCAllONS 971-12 OR 971-1". PARKING STALL STRIPING <br />TO BE ,.- WIDE PAINTED WHITE STRIPES. <br />4. 111E CONTRACtOR IS TO INSTALL EXtRA BASE MATERIAL WHEN 111E DISTANCE <br />BETWEEN Tl1E PAVEMENT ELEVATION AND THE TOP OF n1E PIPE OR BELL IS lESS <br />T11AN IWELVE (12) INCHES. <br /> <br />5. STANDARD INDEXES REFER TO THE LATEST EDIllON OF FOOT "RONJWAY AND <br />TRAFFIC DESIGN STANDARDS". <br /> <br />PAViNO. GAADtNO ~ DRAINAGE TESTING AND MPECTlON REQUIR(f,CENTS <br />1. me: STORM DRAINAGE PIPING AND FILTRATION SYSTEM SHALL BE SUBJECT TO A <br />VISUAL INSPECTION BY THE OWNER'S SOILS ENGINEER 'PRIOR TO THE PLACEMENT OF <br />BACKflLL. <br />2. Tl1E CONTRACTOR SHALL MAINTNN THE STORM DRAINAGE SYSTEMS UNTIL FINAL <br />/>,CCEPlANCE OF THE PROJECT. <br />3. Tl1E CONffiACTOR IS RESPONSIBLE FOR COORDINAllNG THE APPLICABLE TESTING <br />wrrn 111E SOILS ENGINEER. TESTS WILL BE REQUIRED PURSUANT wrrn THE <br />TESTINQ SCHEDULE fOUND IN THE ENGli~EER\NG CONSTRUCTION DRAWINGS. UPON <br />COMPLETION OF THE WORK, THE SOILS ENGINEER MUST SUBMIT CERTIFICATIONS TO <br />111E OWNER'S ENGINEER STATING THAT ALL REQUIREMENTS HAVE BEEN MET. <br /> <br />WATER SYStEM NOTES <br /> <br />1. ALL WATER ~AINS SHALL HAVE A MINIMUM OF 36 INCHES OF' COVER. <br />2. ALL WATER SYSTEM WORK SHALL CONFORM WITH LOCAL REGULATORY STANDARDS AND <br />SPECIFlCATIONS. <br />3. AU., DUCTILE IRON PIPE SHALL BE CLASS 52 IN ACCORDANCE WITH ANSI A 21.50 <br />(AWWA C 150) AND ANSI A 21.31 (AmlA C 151) AND PIPE SHALL RECEIVE <br />EXTERIOR BITUMINOUS COATING IN ACCORDANCE WITH ANSI A 21.6" A 21.8 OR A <br />2f.51 . AND SHALL BE MORT"R LINED. STANDARD THICKNESS, AND BITUMINOUS <br />SEALED IN ACCORDANCE WITH ANSI A (AWNA C 104-71). <br />4. ALL FlTTlNGS LARGER THAN 2" SHALL Be: DUCTILE IRON CLASS 53 IN ACCO~DANCE <br />WITl-1 AWWA C-110 WITl1 A PRESSURE AATING OF 350 PSI. JOINTS SHALL BE <br />MECHANICAL JOINTS IN ACCORDANCE WITH AWNA C-111. FITTINGS SHALL BE <br />CEMENT MORTAA UNED AND COATED IN ACCORDANCE WITH AWWA C-104. <br />5. ALL PVC WATER MAINS 4" Tl1ROUGH 12- SHN..L BE IN ACCORDANCE WITH AWWA <br />C-900. PIPE SHALL BE CLASS 150 AND MEET THE REQUIREMENTS OF SDR 18 IN <br />ACCORDANCE WITH Asm 0-2241. <br />6. W,\TER MAIN PIPING Of lESS THAN 4-- SHALL BE PER PVC SOR26. <br />7. ALL FlTIlNGS 2," AND SMALLER SHALL BE PVC SOR2S WlTI-I PUSH ON JOINTS. <br />8. ALL GATE VALVES 2- OR LARGER SHN..L BE RESILIENT SEAT OR RESIUENT WEDGE <br />MEETING TI-lE REQUIREMENTS Of AWWA C509 <br />9. ALL flRE HYDRANTS SHALL MEET Tl1E REQUIREMENTS OF AWWA C502 AND SHAlL BE <br />APPROVED BY THE LOCAL UTlOO AND FlRE MARSHAL. <br />10. T11E CONTRACTOR IS TO INSTALL TEMPORARY BLOW-OFFS AT THE END OF WATER <br />SERVICE LATERALS TO ASSURE ADEQUATE FLUSHING AND DISINFECTION. <br />1 1. 111RUST BLOCKING ~HALL BE PROVIDED AT ALL FmINGS AND HYDRANTS f>S SHOWN <br />ON DETAiLS. <br />12. MATERIALS AND CONSTRUCTION METHODS FOR WATER DISTRIBUTION SYSTEM SHALL <br />BE IN ACCORDANCE WITH THE LOCAL REGULATORY AGENCY CODES. <br />1 J. THE IRRIGATION sYSTEM SHALL HAVE COLOR CODED PIPING AND LABELING ON THE <br />PIPE TO INSURE DIFFERENTIATION FROM POTABLE WATER PIPING. <br /> <br />'NATER sYSTEttf TESTiNG ~D INSPECTION REQUIRE\f(NTS <br />1. ALL COMPONENTS OF 1'HE WATER SYSTEM. INCLUDING FmlNGS, HYDRANTS. <br />CONNECTIONS. AND VAl:.VES SHALL REMAIN UNCOVERED UNllL PROPERLY PRESSURE <br />TF.STI::D AND: ACCEPTED' BY THE OWNER'S ENGINEER. PRESSURE T~TS TO BE IN <br />ACCORDANCE WITH WATER DEPARTMENT SPECIFICATIONS. CONTRACTOR TO NOllFY <br />OWNER'S tNGINEER AND WATER DEPARTMENT INSPECtORS 48 HOURS IN ADVANCE OF <br />PERFORMING TESTS. <br />2. CONTRACTOR TO PERFORM CHLORINATION. BACTERiOLOGICAL SAMPLING SHALL BE <br />BY mE LOCAL PUBLIC HEALTH UNIT AND/OR LOCAL UTILIlY. <br />CONTRACTOR SHALL OBTAIN CLEARANCE OF DOMESTIC WATER SYSTEM. <br />COPIES OF ALL BACTERIOLOGICAL TESTS TO BE SUBMITIED TO OWNER'S ENGINEER. <br /> <br />2. <br />3. <br /> <br />ELEVATIONS REFER TO TI-lE NATIONAL GEODE11c VERTICAL DATUM. <br />LOCATIONS, UEYATIONS. AND DIMENSIONS OF EXISTING Ul1L1T1ES, STRUCTURES, <br />AND 0111ER FEATURES ARE SHOWN ACCORDING TO 111E BEST INFORMATION AVAILABLE <br />AT THE TIME OF PREPARAll0N OF TIlESE PLANS, Tl-iE CONTRACTOR SHALL VERIFY <br />Tl1E LOCATIONS, ELEVATIONS, AND DI~ENSIONS OF ALL EXISTING Ul1UTIES, . <br />STRUCTURES AND OTHER FEATURES AFFECTING THIS WORK PRIOR TO CONSTRUCTION. <br /> <br />4. <br /> <br />TIlE CONTRACTOf~ SHALL CHECK THE PLANS FOR CONFUCTS AND DISCREPANCIES <br />PRIOR 10 CONSTRUCllON. THE CONTRACTOR SHALL NOTIFY THE OWNER'S ENGINEER <br />OF Atff CONFLICTS OR DISCREPANCIES BEFORE PERfORMING ANY WORK IN THE <br />AFFECTED AREA. <br />THE CONTRACTOR SHAll EXERCISE EXlREME CAUl10N IN AROO OF BURIED <br />Ul1L1TIES, AND SHALL PROVIDE AT LEAST 48 HOURS NOTICE TO THE VAAIOVS <br />UTlU1Y COMPANIES. IN ORDER 10' PERMIT MARKING THE LOCATIONS Of' EXISTING <br />UNDERGROUND UTILITIES, IN ADVANCE OF CONSTRUCTION, BY CALtlNG "SUNSHINE.' <br />AT 1-800-432-4770. n~E CONTRACTOR IS RESPONSIBLE FOR CONTAcTING ALL <br />UTlUTIES NOT INCLUDED IN ll-!E .SUNSHINE" PROGRAM. <br />TIlE CONTRACTOR IS RESPONSIBLE FOR REPAIRING />N( DAMAGE TO EXISTING <br />fACILmES, ABOVE OR BELOW GROUND, lHAT MAY OCCUR I>S A RESULT OF 11iE <br />WORI< PERFORMED BY Tl1E CONTRACTOR. <br />AlL UNDERGROUND UTILITIES MUST BE IN PLACE AND TESTED OR INSPECTED PRIOR <br />TO eASE AND SURFACE CONSlR\JCT10N. <br />IT IS niE CONTRACTOR'S RESPONSIBILl1Y 10 BECOME FAMILIAR W1Tl1 111E PERMIT <br />AND INSPECTION REQUIREMENTS OF THE VARIOUS GOVERNMENTAL AGENCIES. 111E <br />CoNtRACTOR SHALL OBTAIN ALL NECESSARY PERWTS PRIOR TO CONSTRUCTION, AND <br />SCHEDULE INSPECTIONS ACCORDING TO AGENCY INSTRUCTION. <br /> <br />5. <br /> <br />6. <br /> <br />7. <br /> <br />8. <br /> <br />9. 111E CONTRACTOR SHALL SUBMIT FOR APPROVAL TO mE OWNER'S ENGINEER, SHOP <br />DRAWINGS ON All PRECAST AND MANUFACTURED ITEMS WHICH ARE FROM 111IS SITE. <br />FAILURE TO OBTAIN APPROVAL BEFORE INSTALLATION lMAY RESULT IN REMOVAl AND <br />REPLACEMENT AT THE CONTRACTOR'S EXPENSE. ALL SHOP DRAWINGS ARE TO BE <br />REVIEWED AND APPROVED BY THE CONTRACTOIl PRIOR TO SUBMITIAL TO THE <br />OWNER'S ENGINEER. <br />10. AT LEAST mREE (J) WORKING DAYS PlllOR TO CONSTRUCTION, THE CONTRACTOR <br />SHALL NOTIFY THE ENGINEER AND APPROPRIATE AGENCIES, AND SUPPLY Tl1EM WITH <br />ALL REQUIRED SHOP DRAWINGS, THE CONTRACTOR'S NAME, STARTING DATE, <br />PROJECTED SCHEDUl~. AND OTl-lER INFORMATION f>S REQUIRED. ANY WORK <br />PERFORMED PRIOR TO NOTIfYING THE ENGiNEER. OR WITl10UT AGENCY INSPECTOR <br />PRESENT, MAY BE SUBJECT TO REMOVAL AND REPLACEMENT M Tl1E CONTRACTOR'S <br />EXPENSE. <br /> <br />11. BACKfllL MATERIAL SHALL BE SOLIDLY TAMPED AROUND PIPES IN 6- LAYERS UP <br />ro A lEVEL OF AT LEAST ONE FOOT ABOVE TI-lE TOP OF WE PIPE. IN AREAS TO <br />BE PAVED, 8ACKflLL SHALL BE COMPACTED TO 100" MAXIMUM DENSITY f>S <br />DETERMINED BY MSHTO T-99. <br />12. SITE WORK CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF AT LEAST 3,000: <br />P.S.!. IN 28 DAYS, UNLESS OTHERW1SE NOlED. <br />1 J. .ALL PRIVATE AND PUBUC PROPERTY AFFECTED BY THIS WORK SHALL 81:: RESTORED <br />TO A CONDITION EQUAl:. TO OR BETTER THAN EXISTING CONDITIONS UNLESS <br />SPECIFlCAlLY EXEMP1ED BY 111E PLANS. ADDITIONAL COSTS ARE INCIDENTAL TO <br />0111ER CONSlRUCTION AND NO EXTRA COMPENSATION IS TO BE ALLOWED. <br />14. ALL DISTURBED AREAS WHICH ARE NOT TO BE SODDED, ARE TO BE SEWED AND <br />MULCHED TO DOT STANDARDS, AND MAINTAINED UNTIL A SAllSFACTORY STAND OF <br />GRASS. ACCEPTABLE TO THE REGULATORY AGENCY AND ENGINEER OF RECORD. HAVE <br />BEEN OBTAINED. ANY WASHOUTS, REGRADING, RESEEDING. AND GRASSING WORK, <br />AND OTHER EROSION WORK REqUIRED, WILL BE PERFORME:D BY Tl1E CONTRACTOR, <br />UNTIL 111E SYSiEM IS ACCEPTED fOR MAINTENANCE, BY THE: REGVLATORY AGENCY <br />AND ENGINEER OF RECORD. <br />15. THE SOILS ENGINEER IS TO SUPPLY Tl1E ENGINEER WITH A PHOTOCOPY OF ALL <br />COMPACTION TESTS. AND ASPHALT RESULTS. ml:: SOILS ENGINEER IS TO CERTIFY <br />TO Tl1i: ENGINEtR OF RECORD. IN WRITING. THAT ALL TESnNG REQUI~EMENTS, <br />REQUIRED BY THE: LOCAL REGULATORY AGENCY. AND 111E tlORIDA DEPAATMENT OF <br />TRANSPORTATION (FOOl). fOR Tl1E IMPROVEMENTS. AS REQUlRED 8Y THE <br />ENGINEERING CONSTRUCTION DRAWINGS. HAVE BEEN SATISflED. <br /> <br />,16. THE CONTRACTOR SHALt MAINTAIN A COPY OF THE APPROVED PlANS AND PERMITS <br />AT THE CONSTRUCTION SITE. <br />17. n1ESE DRAWINGS DO. NOT INCLUDE NECESSAAY COMPONENts FOR CONSTRUCTION <br />SAFElY. 111E CONTRACTOR IS SOLELY RESPONSIBLE FOR ME'MS AND METHODS toR <br />CONSTRUCTIONSlTE SAFETY. <br />18. ALL SODDING. SEEDING AND MULCHING SHAlL INCLUDE WATERING AND <br />FERTILIZATION. THE CONTRACTOR SHALL BE RESPONSIBlE FOR MAINTAINING THESE <br />AREAS U~L. Tl1E PROJECT IS COMPLETED AND ACCEPTED BY THE OWNER. <br /> <br />ClEARiNG AND GRUe81NG ~OTtS <br /> <br />'" <br /> <br />1. PRIOR TO At<< SITE CLEARING, ALL','TREES SHOWN TO REMAIN ON THE <br />CONSTRUCTION PLANS SHAlL BE PROTECTED IN ACCORDANCE WfTH 111E LOCAL <br />REGULATORY AGENCY'S TREE ORDINANCE AND DETAILS CONTAINED IN TI-lESE PLANS. <br />IT SHALL BE THE CONTRACTOR'S RESPONSIBIUlY TO MAINTAIN Tl1ESE TREES IN <br />GOOD CONDITION. NO TREES SHOWN TO REMAIN SHALL BE REMOVED WITHOUT <br />WRITTEN APPROVAL mOM THE OWNElt <br />2. THE CONTRACTOR IS TO PREPARE Tl1E SITE PRIOR TO BEGINNING ACTUAL <br />CONSTRUCTION IN ACCORDANCE. WITH THE: SOILS TESTING REPORT. COPIES OF Tl1E <br />SOILS REPORT ME AVNLABLE THROUGH 'THE OWNER OR ll~E SOILS TESTlNG <br />. COMPANY. QUESTlONS REGARDING SITe: PREPARATION REQUIREMENTS DESCRIBED IN <br />THE SOILS REPORT ARE TO BE DIRECTED TO TIlE SOILS TESTING COMPANY. <br />J. THE CONTRACTOR SHALL ClEAR AND GRUB, ONLY THOSE PORTIONS OF TI-lE SITE, <br />NECESSARY fOR: CONSTRUCTlON. OlSTURBED AREAS WILL BE SEED EO, MULCHED, OR <br />PlANTED WITH OTl1ER ApPROVED LANDSCAPE MATERlAIL IMMEDIATELY FOLLOWING <br />CONSTRUCTiON. <br />4. THE TOP 4- TO 6" Of GROUND REMOVED DURING CLEARING ANDI GRUBBING SHAlL BE <br />STOCKPILED AT ^ SITE DESIGNATED BY 111E OWNER TO BE USE[) FOR LANDSCAPING <br />PURPOSES, UNLESS OTHERWISE DIRtCtED BY THE OWNER. <br />5. ALL CONSTRUCTION DEBRIS AND OTHER WASTE MATERIAL SHAlL BE DISPOSED OF <br />OFF-SITE IN ACCORDANCE Willi APPLICABLE REGULATIONS. ONLY "GRADING aY <br />HAND'- IS PERMITIED WITHIN niE CANOPY tiNE OF TREES THAT ARE TO REMAIN. <br />6. 111E CONTRACTOR IS TO OBTAIN ALL NECESSARY PERMITS FOR R[MOVING Atff <br />EXISTING STRUCTURES. <br />7. IT IS THE CONTRACTOR'S RESPONSIBllIlY TO NOT1FY ALL UTIUTY COMPANIES TO <br />DISCONNECT OR REMOVE THEIR FACIUTlES PRIOR TO REMOVING OR DEMOliSHING <br />a. niE CONTRACTOR WILL BE RESPONSIBLE fOR MAKING A VISUAL INSPECTION OF 111E <br />SITE AND WILL BE RESPONSIBLE rOR THE: DEMOUTION AND REMOVAl OF ALL <br />UNDERGROUND ~D ,6,BOYE GROUND STRUCTURES THAT WilL NOT BE INCORPORATED <br />WIll-! THE NEW FACILITIES. SHOULD Atff DISCRE:PANCIES EXIST Wlm 111E PlANS, <br />THE CONTRACTOR SHALL BE RESPONSIBLE: FOR CALLING mE OWNER AND REQUESTING <br />^ ClARIFICATION OF Tl-iE PLANS PRIOR TO DEMOLITION. <br />9. DURING CONSTRUCTION, ALL STORM SEWER INLETS IN 111E VICINITY OF THE <br />PROJECT SHALL BE PROTECTED BY SEDIMENT TRAPS SUCH AS SECURED IiAY 8ALES, <br />SOD. STONE, ETC., WHICH SHALL BE MNNTAINED AND MODIFIED f>S REQUIRED ay, <br />CONSTRUCTION PROGRESS. <br />10. ALL EROSION AND SILTATION CONTROL METHODS SHALL BE IMPLEMENTED PRIOR TO <br />mE START Of CONSfRUCTlON AND MAINTNNED UNTIL CONSTRUCTION IS COMPLETE. <br />t 1. WHEN CONSTRUCllON IS COMPLETED, THE RETENTION/DETENTION MEAS WILL BE <br />RESHAPED, CLEANED OF SILT, MUD AND DEBRIS" AND RE-SODDED IN ACCORDANCE <br />TO ll-!E PLANS. <br />12. CONTRACTOR IS TO PROVIDE EROSION CONTROL/SEDIMENTATION BARRIER (HAY <br />BALES OR SILTATION CURTAIN) TO PREVENT SILTATION OF ADJACENT PROPERlY, <br />STREETS, STORM: SEWERS. WATERWAYS, AND EXISTING WETLANDS. <br /> <br />~ <br />~ <br /> <br />HORIZONTAl, SEPARATION 9ET\rtEN UNO€RGROuNO WA'T[RIJAiNS AND SANITARY OR STOR'" <br />stWtRS. WASTE"ATER ~ StwtR F'00Ct IU.lNS AND RtCt)JU(D WAtER PIf)Wt04ES- <br />(A) NEW. OR RELOCATED, UNDERGROUND WATER MAINS SHALL SE LAID TO PROVIDE A <br />HORIZONTAL DISTANCE Of AT lEAST THREE FEET BE1WEEN THE OUTSIDE OF 111E WATER <br />MNN AND TI-lE OUTSIDE OF Atff EXISTING OR PROPOSED sTOR~ SEWER. STORMWt\TER <br />FORCE MAIN, OR PIPE.1..JNE CONVEYING RECLAIMED WATER REGULATED UNDER PART III OF <br />CHAPTER 62- 610, FAC. <br />(B) NEW OR RElOCATED, UND~GROUND WATER MAINS S/-lALL BE LAID TO PROVIDE A <br />HORIZONTAL DISTANCE OF AT lEAST THREE FEET, AND PREFERAeLY TEN FEET, BETWEEN <br />111E OUTSIDE Of' THE WATER MAIN AND 111E OUTSIDE OF I>Nf EXISTING OR PROPOSED <br />VACUUM-1'(PE SANITARY SEWER. <br />(C) NEW OR RElOCATED. UNDffiGROUND WATER MAINS SHALL BE LAID TO PROVIDE A <br />HORIZONTAL DISTANCE OF AT LEAST SIX FEET, ANID PREFERABLY TEN FEET, BElWEEN THE <br />OUTSIDE OF 111E WATER MAIN AND THE OUTSIDE OF ANf EXISTING OR PROPOSED <br />GRAVlTY- OR PRESSURE-1'(PE SANITARY SEWER, WASTEWATER FORCE ~.A1N, OR PIPELINE <br />CONVEYING RECLNMED WATER NOT REGULATED U;NDER PAAT III OF CHAPTER 62-610, <br />F.A.C. mE MINIMUM HORIZONTAL SEPAAAllON DISTANCE BETWEEN WATER MAINS AND <br />GRAVllY- TYPE SANITARY SEWERS SHALL BE REDUCED TO THREE FEET WHERE Tl1E BOTIOM <br />OF 111E WATER MNN \S LAID AT lEAST SIX INCHES ABOVE Tl1E TOP OF 111E SEWER. <br />(D) NEW OR RELOCATED. UNDERGROUND WATER MAINS SHALL BE LAI!} TO PROVIDE A <br />HOR1ZONlN. DISTANCE OF AT lEAST TEN FEET BEtWEEN Tl1E OUTSIDE OF THE WATER ~.AIN <br />AND ALL PARTS OFftN'( EXISTING OR PROPOSED .ON-SITE SEWAGE TREATMENT AND <br />DISPOSAL SYSTEM" AS DEFINED IN SECTION 381.0065(2), f.S., AND RULE 6-4-E-6.002, F.A.C. <br /> <br />vtRTlCAt. SEPARATlQt-4 BETWtE~ UNOE:RCROUNO WATER J.WNS J.<<O SANITARY OR STOO,.. SEwtRS <br />WASTEWATER OR STQRtIWA1ER FORCt t,tAINS. ANO REOI..A1~ED WATER P1PElIM:S · <br />(A) NEW OR RELOCATED, UNDERGROUND WATER MAINS; CROSSING Am <br />e:XISTING OR PROPOSED GRAVlTY- OR VACUUM-TYPE SANITAAY SEWER OR <br />STORM SEWER SHALL BE LAID SO THE OUTSIDE OF THE WATER MAIN IS AT <br />lEAST SIX INCHES, AND PREFERABLY 12 INCHES, ABOVE OR AT LEAST 12 <br />INCHES BElOW Tl-iE OUTSIDE OF THE OTl1ER PIPELINE, HOWEVER, IT IS <br />PREFERABLE TO LAY THE WATER MAIN ABOVE THE OTHER PIPELINE. <br />(8) NEW OR ~ELOCATED, UNDERGROUND WATER MAINS; CROSSlNG ANY EXISllNG OR <br />PROPOSED PRESSURE-TYPE SANITARY SEWER. Wf>STEWATER OR STORMWATER fORCE <br />MNN, OR PIPEUNE CONVE:YING REClAIMED WATER SHALL BE LAlD SO Tl1E OUTSIDE <br />Of THE WATER MAIN IS AT lEAST 12 INCHES ABOVE OR BELOW THE OUTSIDE OF THE <br />0111ER PIPEliNE. HOWEVER, IT IS PREFERABLE TO LAY THE WATER MAIN ABOVE THE <br />0111ER PIPELINE. <br />(C) AT TI-lE UTI LIlY CROSSINGS. DESCRIBED IN PARAGRAPHS (A) AND (B) ABOVE, ONE <br />fULL LENGTH OF WATER MAIN PIPE SHALL BE CENTERED ABOVE OR BELOW Tl1E <br />omER PIPEtlNE SO TI-lE WATER MAIN JOINTS WilL BE AS FAR M3 POSSIBLE FROM <br />TI-lE ornER PIPWNE. ALTE~NATrvRY. AT SUCH CROSSING$. THE PIPES SHAlL BE <br />ARRANGED SO THAT AlL WATER MAIN JOINTS ARE At LEASl' THREE FEET FROM ALL <br />JOINTS IN VACUUM-I'(PE SANITARY SEWERS. STORM SEWERS. STORMW,\TER FORCE <br />MAINS, OR PIPELINES CONVEYING RECLAIMED WATER REGU!.ATED UNDER PART III OF <br />CHAPTER 62-610. FAC., AND AT LEAST SIX FEET fROM ALL JOINTS IN GRAVl1Y- OR <br />PRESSURE-1YPE SANITAAY SEWERS, WASTEWATER FORCE MAINS. OR PIPELINES <br />CONVEYING REClAIMED WATER NOT REGULATED UNDER POO III OF CHAPTER 62-610, FAC. <br /> <br />s.aJtllARV S(W(R t-{Olt~ <br />1. ALL SANITARY SEWER MAINS & LATERAlS SHALL HAVE A MINIMUM OF 36 INCHES OF <br />COVER. <br />2. ALL SAt.mARY SElVER MAINS & SERVICE LATERALS SHALL BE CONSTRUCTED Of <br />POLYVINYL CHLORIDE PIPE, SDR 35 OR AS OTHERWISE It/DlCATED ON THE <br />CONSTRUCllON DRAWINGS. <br />3. All SANITARY SEWER WORK SHALL CONFORM WITH LOCAL REGULATORY STANDARDS <br />AND SPECIFICAll0NS. <br />4. PRIOR TO COMMENCING WORK WHICH REQUIRES CONNECTING NEW WORK TO EXISllNG <br />LINES OR APPURTENANCES, THE CONTRACTOR SHALL VERIFY LOCATION! AND <br />ELEVMION OF EXISTING CONNECTION POINT AND NOflFY OWNER'S ENGINEER OF <br />ANY CONFUCTS OR DISCREPANCIES. <br />5. PVC PIPE AND FITTINGS SHAlL CONFORM TO ASTM SPECifiCATIONS DESIGNAllON <br />D-3034-17C, IIA SOR 35. INSTALLATION OF SDR 35 PI?E SHALL BE IN STRICT <br />ACCORDANCE wrm THE REQUIREMENTS Of ASTM SPECifiCATION SECTION 02321. <br />ALL SANITARY SEWER PIPEliNES SHALL BE SOUD GREEN IN COLOR. <br />6. ALL PVC FORCE MAINS SHALL BE ClASS 2QO. SDRl 21 .1~OLOR GREEN. WfTI-I A <br />GREEN MAGNETIC TAPE A MINIMUM OF 2" WIDE. P'LACED 1 FOOT I3ELOW THE <br />PROPOSED GRADE. THE PRINTING ON THE MAGNErlC TAPE SHOULD READ <br />.FORCEMAlN-. <br />7. ALL DUCTILE IRON PIPE SHALL BE CLASS 52 IN ACCORDANCE WIlli ANSI A 21.50 <br />(AWNA C 150) AND ~SI A21.51 (AWWA C 151). !DUCTILE: IRON PIPE SHALL <br />RECEIVE . INTERIOR AND EXTERIOR BITUMINOUS COATING IN ACCORDANCE WITH ANSI <br />A 21.6, A 21.8. OR A 21.51. <br />a. ALL SANITARY SEWER GRAVl1Y MAINS OR SANITAAY SEWER FORCEMNNS, THAli <br />REQUIRE D.I.P, ARE 1'0 a~ POLYliNE!) OR EPOXY LINED. <br />9. ALL SANITARY SEWER covms SHALL BE mAFFlC RATED FOR H-20 lOADING. <br />10. NEW MANHOLES SHALL BE CONSTRUCTED IN CONrOR~.ANCE WITH CllY STANDARD <br />DETAIL IS10-50, S30-1, $30-11 AND S40'-30. ALL PRECAST STRUCTU~ES SHAlL <br />HAVE AN INTEGRAL FLOOR ,AND Bf>SE RISER SECTION. NO DOG HOUSE STYlE <br />MANHOLES WILL BE ALLOWED. BY PASS PUMPING WILL BE REQUIRED TO MAINTAIN <br />PUBUD SANITARY SEWER FtOWS DURING mE CONSTRUCTION PROCESS. THE CITY <br />ENGiNEERINO DEPARTMENT MUST REVIEW/APPROVE ALL SHOP DRAWINGS ASSOCIATED <br />WITH THE MANHOLE CONSTRUCTION PRIOR TO FA8Rl CATION. <br />11. WHEN SffilNG THE NEW MANHOLE STRUCTURE. THE EXISTING VCP SEWER MAIN <br />WITHIN THE ALLEY MUST BE REMOVED TO UNDISTUR:BED PIPE BEDDING AND <br />REPLACEO WITH PVC. ONLY NEW PVC SHALL ENTm 111E NEW MANHOLE <br />STRUCTURE. <br /> <br />12. CONNECTIONS MADE WHICH JOIN OTI-lER PIPE MATERlIALS TO EXISTING VCP <br />MAINS SHAlL BE MADE USING A STAINlESS STEEL $HIEl!l:D SEWER COUPLING f.S <br />~ANUfACTURED BY MISSION RUBBER COMPANY. GASiKCf TO MEET ASTM C-425-91 <br />TABLE 2,300 SERIES STAINLESS STEEl SHEAR RING WITH A NINIMUM 111ICKNESS <br />OF 0.012-, 316 SERIES STAINLESS STEEL CLAMPS ~VITH !IUT & aOLT TAKE UP, <br />SHEAR RING', AND ClAMPS TO MEET ALL REQUIREME~fTS Qf f>STM A-167. <br />TRANSfTlONAL SIZES TO UTILIZE A ONE PIECE GASKET. EXISTINQ CLAY PIPE <br />SHALL BE REMOVED TO UNDISTURBED PIPE BEDDING AND REPLACED WITH PVC OR <br />DIP AS APPROVED BY TI-lE CIlY. <br /> <br />SANITARY SE:~R TESTING AND INSPECTION REQURt'-lENTS <br /> <br />1. .ALL GRAVITY SEWER PIPING SHALL BE SUBJECT TO A TELEVISION INSPECTION BY <br />THE OWNER'S CONTRACtOR~ CONTRACTOR TO NOllFY '!'HE ENGINEER 48 HOURS IN <br />ADV"NCE TO SCHEDULE INSPECllON. <br />2. Tl1E CONTRACTOR SHALL PERfORM AN EXFllTRATION TESi ON All GRAVllY SEWERS <br />INSTALLEO IN ACCORDANCE WIT\-i! 111E REGULATION AGENCY HAVING JURISDICTION. <br />MAXIMUM ALLOWABLE LEAKAGE RATE: 200 GPD PER lNCH PIPE DIAMETER PER' MILE. <br />TEST RESULTS ARE TO Be: SUBMITTED TO THE REGULATORY AGENCY FOR APPROVAL. <br />COORDINATION AND NOTIF1CATION OF ALL PARTIES IS THE CONTRACTOR'S <br />RESPONSIBILITY. <br />3. ALL FORCE MNNS SHALL BE SUBJECT TO A HYDROSTATIC PRESSURE TEST IN <br />ACCORDANCE WITH TI-lE REGULATORY AGENCY HAVlNG JU~ISDICTION. SAID TESTS <br />ME TO BE CERTIFIED BY 111EENGINEER OF RECORD AND SUBMlTIED TO THE <br />REGULATORY AGENCY FOR APPROVAL. COORDINATION AND NOllFICAllON OF ALL <br />PARTIES IS THE CONTRACTOR'S RESPONSIBILIlY. <br /> <br />. <br /> <br />SEC. <br /> <br />~ l'JYP. Po S., RNC. <br />PASCO COUNTY, <br /> <br />RIE. <br />FLORIDA <br /> <br />s.w.r.w.....D. I EROSION C~TRO!. NOTES <br /> <br />1. DURING CONSTRUCllON SEDIMENT IS TO REMNN ON SITE. 111l:: CONTRACTOR IS <br />RESPONSIBLE FOR THE INSTALLATION OF EROSION AND SEDIMENT CONTROL DEVICES <br />PRIOR TO INIllATING AND DURING Alt. PHASES OF lAND CLEARING AND CONSTRUCTION <br />TO PREVENT SOIL EROSION AND SILTATION. <br /> <br />2. ROUGH EXCAVATE RrtEN110N AREAS. <br />3. DIRECT ALL SURFACE DRAINAGE TOWARD RETENTION AREA DURING CONSTRUCllON. <br />4. AFTER PAVING, GRADE RETENT10N AREAS TO CONTOURS, SHAPE AS SHOWN AND SOD. <br />5. ALL DISTURBED CONOmONS SHALL BE RESTORED TO NATURAL CONDlT10NS, OR BETTER. <br />6. ALL SIDE SLOPES OF" RETENTION OR SWAlE AREAS SHALL BE STABIUZED BY VEGETATION <br />OR OTHER MATERIAlS TO MINIMIZE EROSION AND PROTECT 111E STORMWATER BASIN. <br />NOTE: PLAN CONFUCTS. SHOWN OR UNSHOWN. WITH OTl1ER EXISTING SITE IMPROVEMENTS <br />SHALL BE mE RESPONSI81L11Y OF THE CONTRACTOR TO MAKE ADJUSTMENTS AND PROTECT <br />OR REINSTALL ALL DISTURBED EXISTING UTILITIES, PHONE LINES, POWER LINES. POWER <br />G~b~~~0~~JE~6il:I~[~S U~1r ~R1?~~~G MJ8~~ w"~~IN5DM~~TER PADS <br />FENCE. HANORAlL, VALVES. HYDRANTS, GUY WIRES El!CTRIC BOXES Af.JD PIPELINES ' <br />WHICH SHALL BE REPAIRED OR REINSTALLED f>S INCIDENTAL 10 THE COST OF' WORK SHOWN <br />HEREUNDER. IT SHALL BE THE RESPONSIBILITY Of THE CONTRACTOR TO RESOLVE ANY <br />CONFlJCTS PRIOR TO AWARD OF THE CONTRACT. <br />NOTE: REQUIRED EROSION CONTROL MEASURES MUST REMAIN INTACT 111ROUGHOUT <br />CONSTRUCTION. FNLURE TO INSTALL OR PROPERLY MAINTAIN THESE BARRlCAOES WILL <br />RESULT IN ENFORCEMENT ACTION WHICH MAY INCLUDE CITATIONS, AS PROVIDED BY <br />CHAPTERS 400-4- & 40D-40 FAC. INITlA110N OF CIVIL PENAl1Y PROCEDURES PURSUANT <br />TO SECTION 373.129. F AC, CAN RESULT IN A PENALTY NOT TO EXCEED $10,000 PER <br />OffENSE WITH EACH DATE DURING WHICH SUCH VIOLATION OCCURS CONSllTUl1NG A <br />OffENSE. <br /> <br />MAINTENANCE ANQ OP~RATIONS INSPECTIONS fOR STORMWATER OfSCHARGE FAC1Utf <br />1. ALL SODDED AREAS SHALL BE MOWED AND MAINTAINED PROPERLY. <br />2. UNDER NO CIRCUMSTANCES SHALL THE RETENTION AREA BE FilLED WITl1 ANY OTHER <br />SUBSTANCE THAN STORMWATER. <br />J. SWALE AAOO SHALL BE KEPT CLEAN AND FREE: OF ANY OBSTRUCTIONS. <br />4. IF DAMAGE TO' THE SYSTEM DOES OCCU.Rl.:THE SYSTEM SHALL BE RECONSTRUCTED <br />IN ACCORDANCE WI111 THE APPROVED PLAN. <br /> <br />QPERATION &: MAINTENANCE OF T}1E STQRM>\'ATER SYS\~M <br />TI-lE OWNER SHALL PERIODICAl..LY MONITOR 111E STORMWATER SYSTEM JPIPE CONVEYENCE <br />SYSTEM AND RETENTION POND} FOR SILT AND SEDIMENTATION BUILD P. TI-lE PIPE <br />CONVEYANCE SYSTEM SHALL BE flUSHED, AS DEEMED NECESSARY NO LESS mAN lWlCE <br />A YEAR. AlL MATERIAL SHALL BE COLLECTED DOWNSTREAM AND REMOVED. mE RETENTION <br />POND SHALL BE KEPT MOWED AND THE BOTIOM FREE OF DEBRIS. IF WATER SiANDS IN <br />niE POND MORE THAN 48 HOURS 111E OWNER SHALL RAKE AND/OR SCARIFY mE POND <br />aOTIOM, AS DEEMED NECESSARY AND NO LESS THAN TWICE A '!tAR TO RESTORE mE <br />PERCOlAllON CHARACTERISTICS OF THE POND, n1E OWNER WILL BE RESPONSlBLE TO <br />MAKE SURE 111AT TO 111E BEST OF HIS A81LIlY NOTHING ENTERS Tl-iE SYSTEM BESIDES <br />STORMWATER THAT COULD DETERIORATE n1E FUNCTIONING CAPABIU11ES OF THE SYSTEM, <br />I.E. GASOUNE'. OIL, GREASE. CHEMICAts, ETC. <br />TI-lE POND UNDERORAJN SYSTEM SHALL BE INSPECTED ANNUALLY ANDRETROFlTIED AND <br />FLUSHED SEMI-ANNUALLY. CLOGGED OR SPENT flLTER MATERIAL SHALL BE DISPOSED OF IN <br />ALL MANNERS /is WlTH lHE HANDLING OF HAZERDOUS WASTE. 111E SPENT FlLTER MATERIAL <br />SHALL BE DISPOSED OF IN ^ PERMITIED FACILIlY. <br /> <br />WORK IN rOOT RlGHTS..or..WAY <br />1. DRIVEWAY TO BE CONSTRUCTED TO FOOT INDH515, (LATEST EDIllON AS OF' 3/1/06). <br />2. EROSION CONTROL AND SHOULDER SODDING SHALL CONFORM TO FOOT INDH104 & 105. <br />(LATEST EDIllON AS OF 3/1/06). <br />3. GUARDRAILS SHALL CONFORM TO fOOT INDI400, (LATEST EDITION AS OF 3/1/06). <br />4. ALL TRAFFlC STRIPES AND MARKINGS ARE TO BE LEAO-FREE, NON-SOLVENT BASED <br />THERMOPLASTIC. TI-lE PERMlmE SHALL FURNISH THE DEPARTMENT Vv1ll-! THE <br />MANUFAC11JRER'S CERllflCATION TI-lAT "THE THERMOPLASTIC IS "LEAD fREE-. <br /> <br />5. REFIl.ECTIVE PAVEMENT MARKERS SHALL MEET TI-lE REQUIREMENTS Of FOOT <br />SPECIFICATION SECTION 706, (LATEST EDIllON AS OF 3/1/06). <br /> <br />6. ALL SIGNS W\nilN FOOT RIGHT-Of-WAY SHALL MEET 111E REQUIREMENTS OF FOOT <br />SPECIFICATION SECTION 700. (LATEST EDIllON AS OF 3/1/06). <br /> <br />7. REFLECTIVE PAVEMENT MARKERS SHALL BE PLACED IN ACCORDANCE WIlli FOOT <br />STANDARD INDEX NO. 17352, (LATEST EDIllON AS OF j/1/06). <br /> <br />8. STRIPING WITHIN FUOT RIGHT-OF-WAY SHALL BE PLACED IN ACCORDANCE 'M1}l <br />FOOT STANDARD INDEX NO. 11346, (lATEST EDIllON AS OF 3/1/06). <br /> <br />9. SIGNS W1TI-1IN fOOT RIGHT-Of-WAY SHALL BE CONSTRUCTED IN ACCORDANCE WIlli <br />FOOT STANDARD INDEX NO. 11860, (LATEST EDITION AS OF 3/1106) AND <br />SHALL BE PLACED IN ACCORDANCE ~TH FOOT STANDARD INDEX N<1. 17302, <br />(LATEST EDmON AS OF 3/1/06). <br /> <br />10. SIGNING AND STRIPING WITHIN FOOT RIGHT-Of-WAY SHALL BE IN ACCORDANCE <br />Wln1 THE MANUAL ON UNIFORM TRAFFIC CONTROL DEViCES (MUTeD). <br />(LATEST EDmaN AS OF 3/1/06). <br /> <br />11. ALL WORK PERFORMED 'MTI-lIN THE FLORIDA DEPARTMENT Of TRANSPORTATION <br />RIGHT-OF-WAY CONFORM TO: <br /> <br />A.) FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECifiCATIONS <br />FOR ROAD AND BRIDGE CONSTRUCllON, (LATEST EDmaN AS OF 3/1/06), <br />(ako: STANDARD SPECS). <br />8.) FLORIDA DEPARTMENT OF TRANSPORTATION ROADWAY AND TRAFFIC <br />DESIGN STANDAROS, CONSTRUCTION, MAINTENANCE AND UTILITY OPERAllONS <br />ON WE STATE HIGHWAY SYSTEM. (LATEST EDIllON AS Of ;5/1/06), (aka: <br />STANDARD INDE>C). COMPUANCE WlTI-I ALL APPUCABL~ INDICES IS REQUIRED. <br />C.) flORIDA DEPARThlEN1' OF TRANSPORTATION ROADWAY PLANS <br />PREPARATION MANUAL VOLUME 1. CHAPTER 2 OR 25. <br />(LATEST EDIllON AS Of 3/1/06). <br /> <br />D.) flORIDA DEPARThlENT OF TRANSPORTAllON flEXIBLE PAVEMENT DESIGN <br />MANUAL FOR NEW CONSTRUCTION AND PAVEMENT REHABILITATION, <br />(LATEST EDITION AS OF 3/1/06). <br /> <br />12. TRAfFIC CONTROL & SIDEWALK CLOSURES ARE TO BE PER FOOT INDICES N600 AND H823. <br />(LA TEST EDI110N AS OF 3/1/06). <br /> <br />13. TI-lE APPLICANT MUST NOTIFY' THE FLORIDA DEPT. OF TRANSPORTATION - lOCAL <br />MAINTENANCE OFFICE fa HOURS IN ADVANCe: OF STARTING PROPOSED WORK. <br />CALL: PINELLAS COUNlY, FRED UOHNSON C (727) 570-5101. <br /> <br />14. BEfORE CONSTRUCTION IS TO BEGIN, THE APPUCANT SHALL DELIVER TO THE F"LORtDA Dt?T. <br />OF TRANSPORTATION PROOF OF INSURANCE VERIFYING THAT TI-lE APPLICANT OR 111E <br />APPLICANT'S CONTRACTOR HAS COVERAGE UNDER THE L1ABIUTY INSURANCE POUCY IN <br />ACCORDANCE WIlli THE REQUIREMENTS Of F.A.C" RULE CHPT. 14-96.007(5)(C)e. <br /> <br />15. THE DEPARTMENT REQUIRES DOCUMENTATION Of SUCCESSFUL COMPLETION OF AN APPROVED <br />WORK ZONE TRAFfiC CONTROL TR.AmING COURSE fOR THE AGENCY, Ul1UTY OR CONTRACTOR <br />EMPlOYEE(S) INSTALLING AND/OR MAINTAINING TI-lE APPROVED MAINTENANCE OF TRAFfiC OF <br />TRAFFIC PLAN. DOCUMENTATION IS TO BE FURNISHED TO WE DEPARTMENT AT THE <br />PRE:"'CONSTRUCTION MEETING OR BEFORE OCCUPYING STATE RIGHT-Or-WAY. ALL LANE <br />CLOSURES MUST BE APPROVED IN ADVANCE BY flORIDA OEPARTI-AENT OF TRANSPORTATION. <br /> <br />REV.' DATE <br /> <br />REVISION <br /> <br />BY <br /> <br />C. Fred Deuel and Associates, Inc. <br />CONSULTING ENGINEERS. LAND SURVEYORS. LAND PLANNERS <br />ST. PETERSBURG. ZEPHYRHILLS <br /> <br />~OTItt lO All. CONTAACtORS ANO DEvtLOPtRS <br /> <br />St. Petersburg Main Ofnce: <br />1620 First Avenue North <br />st. Petersburg, Fl 33713 <br />Phone: (727) 822-4151 rax: (727) 821-7255 <br /> <br />Zaphyrhms Branch Office: <br />5151 Gall Boulevard <br />Zephyrhllls. F'L 33541 <br />Phone: (813) 782-6717 tax: (813) 782-5-428 <br /> <br />THE DOMESTIC WATER SYSTEM AND 111E STORM DRAIN flLTER SYSTEM fOR TI-lIS PROJECT .M!m" BE <br />INSPECTED BY OUR OfFiCe: IN ORDER Tl1AT Tl1EY BE CERTlflED TO Tl1E APPROPIATE GOVERNMENTAL <br />AGENCY. IT IS, mEREFORE. IMPERATIVE THAT OUR OFFICE BE :NOTlflED AT LEAST 24 HOURS PRIOR <br />TO BACKFILLING OVER THESE FACIUTIES. f'AILURE TO DO SO WILL RESULT IN iHESE FACILITIES <br />HAVING TO BE UNCOVERED AND INSPECTED BEfORE A CERTIFICATE OF OCCUPANCY IS ISSUED. <br />YOUR CERTlFlCATE OF OCCUPANCY WILL BE WITHHELD UNTIL THE MAnER IS RESOLVED. <br /> <br />C. FRED DEUEL & ASSOCIA1ES, INC. <br />(727) 822-4151 <br /> <br />./Votes &- Spe~iftcatz'ons Plan <br />PROPOS'S'/} OFF/Cff Bt//.l/J/HC <br />for zq~,_l'A;Y J?~7'ffY <br /> <br />~ - C::/A 7 -' 1/- <br />( -Oof~/~z U/OG <br />flORIDA SU~OR'S REGlSTRA nON NO. <br />flORIDA ENGINEER'S REGISTRATION NO. ~~qlo <br /> <br />OF <br /> <br />4} <br /> <br />Zephyrhil!s <br /> <br />FLORIDA <br /> <br />WORK ORDER No.1 14454- -ZH <br />DATE: 02/27/06 <br />SCALE: NONE <br />SHEET <br />No. <br /> <br />DESIGN: <br /> <br />DRAWN: <br /> <br />CHECKED: <br /> <br />4} <br />